Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
9 JULY 2025
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDING 30 JUNE 2025
HIGHLIGHTS:
Golden Pike High-Grade Gold Project (Under Due Diligence)
•
Binding option term sheet signed with Globex Mining Enterprises Inc. (TSX: GMX, OTCQX: GLBXF,
FSE: G1MN-FSE) to acquire the Golden Pike high-grade gold project in New Brunswick, Canada,
subject to due diligence
•
The due diligence process for the Golden Pike Project has been led by experienced mining and
engineering professional, Greg Hill
Bryah Basin Copper-Gold Project (100%)
•
Review of the Company’s Bryah Basin copper/gold assets underway by newly appointed CEO
Gabanintha Nickel, Copper and Gold Project (Mineral Rights 100%)
•
Discussions progressed with various third parties for a possible sale of the Company’s mineral rights
over the Australian Vanadium Project
•
Untested gold targets have been identified
Bryah Basin Manganese Joint Venture Project (40% JV Interest)
•
Ground Penetrating Radar (GPR) used for trial delineation of channel type manganese
•
Environmental field surveys completed on Mining Licences
Corporate
•
Ashley Jones stepped down as CEO and moved into the role of Non-Executive Director
•
Brian Davis stepped down as Non-Executive Director
•
Subsequent to the end of the quarter, Greg Hill joined Bryah as CEO
•
Cash position of $586,974 at the end of the quarter
Management Comment
CEO, Greg Hill comments, “I am excited to join the Bryah team as we focus on building value for shareholders
by pursuing commercial development pathways for our existing and potential future assets. We will take a
diligent approach to work program expenditures to maximise our exploration potential.”
191B Carr Place
Leederville
WA 6005
Tel: +61 8 9321 0001
ABN: 59 616 795 245
ASX: BYH
bryah.au
Follow us on social media:
Bryah Resources Limited (“Bryah” or the “Company”) is pleased to provide a summary of activities completed
during the June 2025 quarter.
Golden Pike Gold Project, New Brunswick, Canada (Option term sheet under due
diligence)
The Company has signed a binding option term sheet with Globex Mining Enterprises Inc. (TSX: GMX, OTCQX:
GLBXF, FSE: G1MN-FSE) to acquire the Golden Pike high-grade gold project in New Brunswick, Canada. 1 The
Golden Pike Gold Project has a NI 43-101 Foreign Resource Estimate (table below) 2 modelled from a high cutoff grade of 5 g/t Au:
Classification
Zone
Tonnes (‘000)
Au (g/t)
Oz (‘000)
Inferred
Main Zone
78.2
11.47
28.8
Inferred
Parallel Zone
136.6
8.54
37.5
Inferred
Total
214.8
9.60
66.3
*Cautionary Statement: The estimates of the quantity and grade of mineralisation for the Golden Pike Project referred
to in this announcement are “foreign estimates” within the meaning of the ASX listing rules and are not reported in
accordance with the JORC Code 2012. A competent person has not undertaken sufficient work to classify the foreign
estimates as mineral resources in accordance with the JORC Code 2012. It is uncertain that following evaluation and
further exploration work that the foreign estimates will be able to be reported as mineral resources in accordance with
the JORC Code.
The Golden Pike project has a historical Inferred Mineral Resource and is located in a mining region which
has seen historic gold, antimony, base metals and potash mining. Current exploration in the area is for gold,
antimony, tin, indium and zinc. Access to infrastructure enables the potential to ship ore to a processing
facility for toll treatment. The option period was extended to allow the Company time to fully evaluate the
project. 3
Figure 1 - Core from drilling undertaken by Rockport in 2007 and 2008, inset magnified
1 ASX announcement 21 May 2025 ‘Acquisition of Advanced High-Grade Gold Project’
2
Notes from 2011 NI 43-101 Technical Report, Roscoe Postle Associates Inc., 19 August 2011:
1. Canadian Institute of Mining, Metallurgy and Petroleum (CIM) definitions have been followed for classification of Mineral
Resources.
2. The Qualified Person for this Mineral Resource estimate is Tudorel Ciuculescu, P.Geo.
3. Mineral Resources are estimated at a cut-off grade of 5 g/t Au and a minimum thickness of two metres.
4. Mineral Resources are estimated using an average long-term price of US$1,200 per oz Au, and a C$:US$ exchange rate of
1:1.
5. The Mineral Resource estimate uses drill hole data available as of May 26, 2011.
6. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
7. Totals may not add correctly due to rounding.
3 ASX announcement 16 June 2025 ‘Golden Pike Option Extension’
ASX: BYH | bryah.au
2
Bryah Basin Copper-Gold Projects
The Bryah Basin project covers approximately 1,048km2 in central Western Australia (see Figure 2). The
project is located close to several mining operations including the high-grade Volcanogenic Massive Sulphide
(VMS) DeGrussa copper-gold mine which was operated by Sandfire Resources NL (ASX: SFR) until May 2023
and the Fortnum gold mine which is operated by Westgold Resources Limited (ASX: WGX).
Bryah’s tenements cover large areas of under-explored and highly prospective ground adjacent to the
copper-gold deposit at Horseshoe Lights, which is hosted in similar aged volcanic and sedimentary rocks to
the DeGrussa copper-gold mine.
Figure 2 - Bryah Basin Project Location Plan
Bryah Resources is currently reviewing and refining geophysical survey data, recent exploration activities and
historical datasets. 4 The Company will use the results of this review to determine the most prospective
exploration and development pathways.
Gabanintha Gold and Base Metals Project
Bryah holds the rights to all minerals at the Gabanintha Project except Vanadium, Uranium, Cobalt,
Chromium, Titanium, Lithium, Tantalum, Manganese & Iron Ore (Excluded Minerals), which are retained by
Australian Vanadium Limited (ASX: AVL). The Gabanintha Project covers approximately 80km2, located
~40km south of Meekatharra in Western Australia.
4 ASX announcement 15 April 2025 ‘Exploration to Target High-Grade Gold’
ASX: BYH | bryah.au
3
Bryah is in discussions to sell its nickel and other metal rights over the Gabanintha Project for non-dilutive
cash. Australian Vanadium Limited has first right of refusal to purchase the rights.
High-grade gold occurs in a cross-cutting fault zone within the vanadium-titanomagnetite (VTM) deposit,
which holds potential for significant gold mineralisation. Major cross faults over 11 km of VTM deposit now
represent untested gold targets.
The Company has commenced a strategic review of gold prospectivity on the Gabanintha Project area, noting
high-grade mineralisation within the mining lease identified in 2021 and other potential targets on the
tenement package.4 The review will focus on identifying pathways to monetise the inherent value in the
mineral rights.
Bryah Basin Manganese Joint Venture (BYH - 40% JV Interest)
Flora surveys have been progressed on the Company’s manganese Mining Licences in the Bryah Basin, in
conjunction with joint venture partner OM (Manganese) Ltd (OMM). The study has been funded by OMM. 5
Bryah and OMM, a wholly owned subsidiary of ASX-listed OM Holdings Limited (ASX: OMH), have a
Manganese Farm-In and Joint Venture Agreement (JV Agreement) which applies to the rights to manganese
only over approximately 600 km2 of the entire tenement package held by the Company in the Bryah Basin
(see Figure 3), which is also prospective for gold and copper. The manganese JV Agreement includes the
Horseshoe South Manganese Mine, which is the largest historical manganese mine in the region.
Figure 3 - Bryah Basin Tenure
5 ASX announcement 29 May 2025 ‘Manganese Update – Flora Survey Underway’
ASX: BYH | bryah.au
4
CORPORATE ACTIVITIES
Board and Management Changes
Mr Ashley Jones has stepped down as Chief Executive Officer (CEO) effective 1 April 2025 and has transitioned
into the role of Non-executive Director at Bryah.
Non-executive Director, Brian Davis, has stepped down as director of Bryah after completing a period of over
3 years. 6
The Company has appointed experienced mining and engineering professional, Greg Hill as CEO, effective
from 1 July 2025. 7
Capital Structure
As at 30 June 2025, the Company had 869,953,522 ordinary shares on issue, 468,698,347 listed options
exercisable at $0.035 expiring 1/12/2025, 2,000,000 unlisted options exercisable at $0.054 expiring
12/08/2025 and 22,611,111 unlisted options exercisable at $0.012 expiring 02/07/2027.
Cash Position
As at 30 June 2025, the Company had $586,974 (31 March 2025: $436,407) in cash.
Shares in Star Minerals Limited (ASX: SMS)
As a result of the Star Minerals Limited Placement 8 Bryah Resources now holds a voting power of 5.92% in
that company, reduced from 7.25% as at 31 March 2025.
Receipt of Notice Under Section 249D
On 29 May 2025 Bryah Resources received a request for Directors to call a General Meeting pursuant to
Section 249D of the Corporations Act 2001 (Cth). 9 A General Meeting has been called for 29 July 2025 at 2pm
and a Notice of Meeting was released to the ASX and sent to shareholders on 19 June 2025. 10
Additional ASX Information
During the quarter the Company spent $26k on exploration and evaluation. Of this expenditure, $11k related
to quarterly geological staff costs, with the balance allocated between annual tenement rental payments,
shire rates and tenement management.
No production and development activities were undertaken during the quarter.
Subsequent to the end of the quarter the Company, through its wholly owned subsidiary West Coast Minerals
Pty Ltd, acquired a 0.75% Net Smelter Return mineral royalty over two Mining Leases and four Exploration
Licences held by Bryah from Luke Innes as trustee of The Luke Innes Services Trust. Consideration paid for
the purchase of the 0.75% royalty over mining lease M51/1087 and M51/1088, in addition to four exploration
licences, was 100,000,000 Bryah shares. 11
6 ASX announcement 31 March 2025 ‘Board and Management Changes’
7 ASX announcement 1 July 2025 ‘Experienced Mining and Engineering Professional Appointed as CEO’
8 See Star Minerals Limited (ASX: SMS) ASX announcement 4 June 2025 ‘Completion of $1.6 Million Placement’
9 ASX announcement 2 June 2025 ‘Section 249D Notice’
10 ASX announcement 19 June 2025 ‘Notice of General Meeting/Proxy Form’
11 ASX announcement 3 July 2025 ‘Mineral Royalty Purchased by Subsidiary of Bryah Resources’
ASX: BYH | bryah.au
5
The aggregate amount of payments to related parties and their associates included in Section 6.1 of the
Appendix 5B cash flows from operating activities was $102k for Directors’ fees.
For further information, please contact:
Greg Hill
Chief Executive Officer
Tel: +61 8 9321 0001
The board of directors of Bryah Resources Limited has authorised this announcement to be given to the ASX.
ASX: BYH | bryah.au
6
Table 1 - Tenement Information
Tenement Information as Required by Listing Rule 5.3.3
For the Quarter Ended 30 June 2025
Location
Project
Tenements
Western Australia
Gabanintha
Western Australia
Bryah Basin
E51/843
E51/1534
M51/878
E52/3014
E52/3236
E52/3237
E52/3238
E52/3240
E52/3349
E52/3401
E52/3453
E52/3454
E52/3508
E52/3700
E52/3703
E52/3705
E52/3725
E52/3726
E52/3848
E52/3871
E52/3898
E52/3963
M52/1068
E52/1557
E52/1860
M52/806
E52/4096
P52/1659
M52/1087
M52/1088
E52/4178
E63/2132
E63/2134
E63/2135
E63/2156
E63/2157
E63/2158
E63/2159
Western Australia
Lake Johnston
Economic
Interest
100%3,4
100%3,4
100%3,4
100%
100%1,5
100%1,5
100%5
100%1,5
100%1
100%1,6
100%6
100%6
100%1
100%
100%
100%
100%
100%
100%
100%
100%
100%1
49%1,2
49%1,2
49%1,2
100%1
100% 1
100%1
100%1,5
100%1,5
100%1
100%
100%
100%
100%
100%
100%
100%
Notes
Manganese Rights only
Manganese Rights only
Manganese Rights only
Change in
Quarter %
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Note 1: OM (Manganese) Limited has earned a 60% interest in the Manganese Mineral Rights only on these tenements (southern
portion of E52/3236 only). Bryah retains 100% rights to all other minerals on these tenements.
Note 2: Bryah Resources Limited holds the Mineral Rights to prospect, explore, mine and develop manganese ore (Manganese
Mineral Rights) only. Annual expenditure commitment obligations remain with the primary tenement holder.
Note 3: Bryah Resources holds the Mineral Rights for all minerals except V/U/Co/Cr/Ti/Li/Ta/Mn & iron ore only. Australian
Vanadium Limited retains 100% rights in V/U/Co/Cr/Ti/Li/Ta/Mn & iron ore on the Gabanintha Project. Annual expenditure
commitment obligations remain with Australian Vanadium Limited.
Note 4: Australian Vanadium Limited retains a 0.75% Net Smelter Return Royalty.
Note 5: The Luke Innes Service Trust holds a 0.75% Net Smelter Return Royalty. Subsequent to the end of the quarter, West Coast
Minerals Pty Ltd, a wholly owned subsidiary of Bryah Resources Limited, purchased the royalty.; ASX announcement 3 July
2025 ‘Mineral Royalty Purchased by Subsidiary of Bryah Resources’).
Note 6: Jalein Pty Limited retains a 0.75% Net Smelter Return Royalty.
ASX: BYH | bryah.au
7
APPENDIX 1
JORC Resource Cu Ni
An Indicated and Inferred Base Metal Mineral Resource for the Australian Vanadium Project was reported
within the high-grade vanadium domain, beneath the base of sulphide weathering, in the areas of highest
drill density (80 – 140 metre spaced drill lines with 30 metre drill centres). Base metals are potentially
economically recoverable as a sulphide flotation of the tails produced through beneficiation of the vanadium
ore. Due to the reliance on concentration of the base metals into the non-magnetic tails through
beneficiation of the vanadium ore, the Indicated Mineral Resource is restricted to the high-grade domain
within the pit optimisations from AVL’s Bankable Feasibility study (BFS). 12 Inferred Mineral Resource is
located beneath the optimised pits in the vanadium high-grade domain within classified vanadium Mineral
Resources. Table 2 below outlines the resource by pit area.
Table 2 - May 2022 Base Metals Mineral Resource Inventory at the Australian Vanadium ProjectError! Bookmark not defined.
2022 Base Metals
Resource Area
Classification
Million Tonnes
(Mt)
Ni
ppm
Cu
ppm
Co
ppm
S%
In Pit North
Indicated
7.6
719
211
227
0.20
In Pit Central
Indicated
4.6
775
191
228
0.23
In Pit South
Indicated
3.8
834
220
264
0.11
Total In Pits
INDICATED
16.1
762
207
236
0.19
Under North Pit
Inferred
8.0
710
202
180
0.20
Under Central Pit
Inferred
3.5
755
197
231
0.25
Under and within
South Pit
Inferred
8.4
834
236
268
0.15
Total Under Pits
INFERRED
19.9
770
216
226
0.19
Total Base Metals
Resource
GLOBAL
36.0
766
212
231
0.19
The Indicated Mineral Resources portion is 16.1 Mt at 762 ppm Nickel, 207 ppm Copper and 236 ppm Cobalt.
This part of the resource falls entirely within the existing pit designs for the proposed 25 year mine-life
vanadium project and is expected to be processed through the 1.6 Mt per annum crushing, milling and
beneficiation plant.
The remaining Inferred Mineral Resource lies within the classified vanadium resource in the high-grade
domain beneath the base of each of the designed pits where pit optimisations are currently drill limited,
highlighting the potential for future production.
12 See Australian Vanadium Limited (ASX: AVL) announcement dated 6 April 2022 ‘Bankable Feasibility Study for the Australian
Vanadium Project’
ASX: BYH | bryah.au
8
About Bryah Resources Limited
Bryah’s current assets are located in Western Australia, a Tier One global mining and exploration jurisdiction.
Strategically the Projects are energy metals focused, or able to exploit synergies of geological knowledge,
locality and exploration.
The Lake Johnston tenements are prospective for battery metals lithium and nickel. The corridor near Lake
Johnston contains significant mines and discoveries of nickel and lithium, including the historical Maggie
Hays/Emily Ann nickel deposits and the TG Metals Burmeister Project and Charger Metals’ Medcalf Prospect.
The prospective Bryah Basin licences cover 1,048km2 and have a potential new Volcanogenic Massive Sulphide
(VMS) ‘Horseshoe Lights type’ mine analogue with multiple other untested targets. The area also contains
extensive outcroppings of manganese, the subject of a substantial $7M joint venture with ASX listed OM
Holdings Limited (ASX: OMH). OMH is a vertically integrated manganese producer and refiner with a market
capitalisation of ~$300m. Bryah and OMH have an excellent working relationship, with OMH having already
spent over $4.5 million to earn-in to the Manganese Rights of the Project.
Gabanintha, near Meekatharra, has a JORC 2012 Mineral Resource for Cu, Ni, Co and additional structural
gold potential. The copper nickel resource and identified gold mineralisation at Gabanintha will be the subject
of further drill definition and a prefeasibility study to integrate the project with the Australian Vanadium
Project (ASX: AVL). The resource has been defined by the drilling efforts of AVL in the development of its
vanadium project and enabled Bryah to define a base metal resources inventory. Bryah is in discussions to sell
its nickel and other metal rights over the Australian Vanadium Project for non-dilutive cash. Australian
Vanadium Limited has first right of refusal to purchase the rights.
Bryah holds 5.92% of gold focused Star Minerals (ASX:SMS). Star Minerals has a Mineral Resource at
Tumblegum South Gold Project and exploration prospects in the West Bryah Basin.
Bryah is currently undertaking due diligence on a binding option to acquire the Golden Pike high-grade gold
project in New Brunswick, Canada.
ASX: BYH | bryah.au
9
Competent Person Statement – Exploration Results
The information in this announcement that relates to exploration results is based on information compiled by
Mr Ashley Jones, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and is a
director of Bryah Resources. Mr Jones has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Jones consents to the inclusion in this announcement of the matters based
on his information in the form and context in which it appears.
Where the Company refers to Exploration Results in this announcement (referencing previous releases made
to the ASX), the Company is not aware of any new information or data that materially affects the information
included in the relevant market announcements.
Competent Person Statement — Mineral Resource Estimations
The information in this announcement that relates to Gabanintha Base metals Mineral Resources (see ASX
announcement dated 25 May 2022) is based on and fairly represents information compiled by Mr Lauritz
Barnes, (Consultant with Trepanier Pty Ltd) and Mr Brian Davis (-Consultant with Geologica Pty Ltd). Mr
Barnes and Mr Davis are both members of the Australasian Institute of Mining and Metallurgy (AusIMM) and
the Australian Institute of Geoscientists (AIG). Both have sufficient experience of relevance to the styles of
mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as
Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Specifically, Mr Barnes is the
Competent Person for the estimation and Mr Davis is the Competent Person for the database, geological
model and site visits. Mr Barnes and Mr Davis consent to the inclusion in this announcement of the matters
based on their information in the form and context in which they appear.
The information in this announcement that relates to Mineral Resources is based on and fairly represents
information compiled by Mr Lauritz Barnes, (Consultant with Trepanier Pty Ltd), and Ms Gemma Lee
(Consultant to Bryah Resources Limited). Mr Barnes and Ms Lee are members of the Australasian Institute of
Mining and Metallurgy (AusIMM) and/or the Australian Institute of Geoscientists (AIG). Both have sufficient
experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the
activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore
Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Specifically, Ms Lee is the Competent Person for the geological model and site visits and for
the geological database. Mr Barnes is the Competent Person for the estimation. Mr Barnes, and Ms Lee
consent to the inclusion in this announcement of the matters based on their information in the form and
context in which they appear.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in these announcements and all material assumptions and technical parameters
underpinning the Mineral Resource estimates with those announcements continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Persons
findings are presented have not materially changed from the original announcement.
Foreign Estimate Statements
The Foreign Estimate of the deposit for the Golden Pike Gold Project referred to in this announcement was
completed in 2011 for Portage Minerals Inc. The estimate was prepared in accordance with Canadian N43 101 but has been treated as a foreign estimate as a competent person has not undertaken sufficient work to
ASX: BYH | bryah.au
10
classify the estimates in accordance with the JORC Code 2012 and the ASX listing rules and has not signed off
on the estimate as a JORC Code mineral resource. It is uncertain whether following evaluation and further
exploration work that the historical estimates will be able to be reported as mineral resources in accordance
with the JORC Code.
The information in this announcement that relates to the Foreign Estimate in respect of the Mineral Claim is
based on information compiled by Mr Ashley Jones, who is a member of the Australasian Institute of Mining
and Metallurgy (AusIMM) and qualifies as a ‘Competent Person’. Mr Jones is a director of Bryah Resources
Limited. Mr Jones confirms that the information contained in this announcement about the Foreign Estimate
is an accurate representation of the available data and studies for the Mineral Claim.
Forward Looking Statements
This report may contain certain “forward-looking statements” which may not have been based solely on
historical facts, but rather may be based on the Company’s current expectations about future events and
results. Where the Company expresses or implies an expectation or belief as to future events or results, such
expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward
looking statements are subject to risks, uncertainties, assumptions and other factors which could cause actual
results to differ materially from future results expressed, projected or implied by such forward-looking
statements. Readers should not place undue reliance on forward looking information. The Company does not
undertake any obligation to release publicly any revisions to any “forward looking statement” to reflect events
or circumstances after the date of this report, or to reflect the occurrence of unanticipated events, except as
may be required under applicable securities laws.
ASX: BYH | bryah.au
11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BRYAH RESOURCES LIMITED
ABN
Quarter ended (“current quarter”)
59 616 795 245
30 JUNE 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(26)
(171)
(b) development
-
-
(c) production
-
-
(d) staff costs
(63)
(197)
(e) administration and corporate costs
(182)
(706)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
1
13
1.5
Interest and other costs of finance paid
-
(1)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other
(20)
8
1.9
Net cash from / (used in) operating
activities
(290)
(1,054)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(51)
(51)
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(51)
(51)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
570
1,200
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(78)
(105)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
492
1,095
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
436
597
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(290)
(1,054)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(51)
(51)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
492
1,095
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
587
587
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
587
436
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
587
436
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
102
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(290)
8.4
Cash and cash equivalents at quarter end (item 4.6)
587
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(290)
-
587
2.02
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 qu
Share your feedback
Discover