Golden Pike Gold and Antimony Project Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
26 AUGUST 2025
Golden Pike Gold and Antimony Project Update
HIGHLIGHTS
•
•
•
•
•
High-grade antimony outcrop drill targets identified
On-ground prospecting and antimony rock chip sampling to commence early September
High-grade gold deposit extensional drilling planning advanced
Mine planning and mineral resource update to JORC compliance underway
Environmental consultants engaged to commence permitting process
Bryah Resources Limited (“Bryah” or “the Company”) provides an update on its Golden Pike Gold and
Antimony Project.
The due diligence process undertaken on the Golden Pike Project highlighted the strong prospectivity
of the mineral claims for gold and antimony exploration. The current gold foreign estimate was the
subject of a conceptual mine study, which was a key factor in the board’s decision to conclude the
option agreement with Globex Mining Enterprises Inc. (GMX-TSX, GLBXF-OTCQX, G1MN-FSE). 1
The Golden Pike Gold and Antimony Project is located in New Brunswick, Canada.
Figure 1 - Golden Pike Project Location
1
ASX announcement 22 July 2025 ‘Contract Signed for Golden Pike Project’
Bryah Resources Limited
191B Carr Place
Leederville, WA 6007
Phone: +61 8 9321 0001
Email: info@bryah.au
ASX: BYH
ABN: 59 616 795 245
The project is located 90km north of the port city of Saint John and comprises 146 contiguous mineral
claims covering approximately 3,292 ha. The project is approximately 120km from the USA border,
near to national road and rail networks, and with grid power adjacent to the site.
CEO, Greg Hill comments, “It’s very exciting that the Golden Pike Gold and Antimony Project is showing
itself to have significant exploration upside in the strategic mineral antimony, in addition to the known
and open high-grade gold deposit. I look forward to meeting with our local New Brunswick consultants
on site in September to kick off our field work programs.”
The Company has reviewed prospecting results, soil geochemical surveys, and drill core assays which
were provided during the due diligence process. The review highlighted significant prospectivity for
high-grade antimony at the Bond Road occurrence at the Project (see Figure 2). 2
The Bond Road occurrence has been interpreted as an outcropping antimony rich vein which has
yielded several historical boulder samples grading up to 53% Sb. This is in addition to core intercepts
of 0.5m at 12.5% Sb from 76.50m and 0.3m at 4.74% Sb and 2.38 g/t Au from 17.70m in DPA-16-01
and DPA-16-03 respectively at Albright Brook, 1.1km to the northeast of the Bond Road occurrence.
Figure 2 – Bond Road high-grade antimony drill target prospects
Antimony occurrences at Bond Road and Albright Brook are interpreted to have a northwest to
southeast trending strike of hydrothermal fluid derived mineralisation, along faults that run between
2
ASX announcement 16 July 2025 ‘Due Diligence Highlights Antimony at Golden Pike’
ASX: BYH | bryah.au
2
the thrust envelope Albright Brook Fault to the north and the Taylor Brook fault to the south. These
major thrust faults bound the Annidale Group rocks that are prospective for antimony. This northwest
to southeast antimony vein orientation (red faults on Figure 2) is demonstrated to be present at the
neighbouring Antimony Resources Corp Bald Hill Project, approximately 3km the west of Bond Road.
Bryah plans to commence the following antimony exploration activities in the Bond Road area in the
coming weeks, including:
•
•
•
Detailed field survey and mapping of the area immediately around the Bond Road antimony
occurrence
Drill program planning and permitting
Contractor engagement for antimony exploration drilling
Golden Pike Gold Deposit
Bryah has engaged the services of an independent consultant to review data acquired in previous
work programs on the Golden Pike Gold Project. The Company is aiming to report a JORC compliant
resource by the end of the year. Following this, the Company plans to undertake a mine development
scoping study, including a detailed transport and mill option study.
The due diligence process has identified that the known Golden Pike high-grade gold deposit is open
or has possible duplicate lodes in multiple directions. Data review has determined the area
immediately to the northeast of the deposit is highly prospective for further mineralisation. Similar
structural targets in the axial plane may also be reflected in anomalous soils 3 to the southeast of the
existing known gold deposit in the adjacent fold closure. These targets are shown below in Figure 3.
Figure 3 – Extensional Targets around Existing Golden Pike Gold Deposit
3
ASX announcement 21 May 2025 ‘Acquisition of Advanced High-Grade Gold Project’
ASX: BYH | bryah.au
3
The Company plans to commence infill and extensional drilling of the Golden Pike high-grade gold
deposit before the end of the year. The results from this work will be incorporated into the geology
model developed for a mineral resource update.
The Company has appointed environmental consultants SLR Consulting in Canada to undertake
environmental studies and commence the environmental approval process for the project. Phase 1
of the environmental work will include a field reconnaissance survey of the area around the Golden
Pike gold deposit, preliminary archaeological impact assessments, environmental DNA surveys and a
desktop review with preliminary site characterisation. An initial field survey will be undertaken in
September.
For further information, please contact:
Greg Hill, CEO
+61 8 9321 0001
This announcement has been produced in accordance with the Company's published continuous
disclosure policy and has been approved by the Board.
ASX: BYH | bryah.au
4
ABOUT BRYAH RESOURCES
Bryah’s current projects are located in Canada and Western Australia, both Tier One global mining
and exploration jurisdictions.
Bryah has exercised its option to acquire the Golden Pike Gold and Antimony Project in New
Brunswick, Canada. The project covers approximately 3,292ha of contiguous mining claims which
includes a high-grade gold deposit classified under NI43-101,4 and the high-grade Bond Road
antimony occurrence. The Golden Pike project is located in a rural area that is close to road, rail, port
and grid power infrastructure. It is approximately 120km from the border with the USA, which has
the only operating antimony smelter in North America.
The Company’s Bryah Basin licences cover 1,048km2 and hold potential for copper and gold. Bryah
also has a substantial $7M manganese joint venture on the licences with ASX listed OM Holdings
Limited (ASX: OMH), with OMH having already spent over $4.5 million to earn-in to the Manganese
Rights of the project.
Bryah holds a suite of mineral rights5 over the Gabanintha project, near Meekatharra, which has a
JORC 2012 Mineral Resource for Cu, Ni, Co and additional structural gold potential.
Bryah’s Lake Johnston tenements are prospective for battery metals lithium and nickel.
Bryah holds 5.88% of gold focused Star Minerals (ASX:SMS). Star Minerals has a Mineral Resource at
Tumblegum South Gold Project and exploration prospects in the West Bryah Basin.
4
5
See ASX announcement 21 May 2025 ‘Acquisition of Advanced High-Grade Gold Project’
See ASX announcement 25 May 2022 ’36 Million Tonne Nickel-Copper-Cobalt Mineral Resource at Gabanintha’
ASX: BYH | bryah.au
5
COMPLIANCE STATEMENTS
The information in this announcement that relates to exploration results is based on information
compiled by Ms Gemma Lee, who is a Member of the Australian Institute of Geoscientists (AIG) and
is Principal Geologist for Bryah Resources Limited. Ms Lee has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity which she is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Ms Lee consents to the
inclusion in this announcement of the matters based on her information in the form and context in
which it appears. Where the Company refers to Exploration Results in this announcement
(referencing previous releases made to the ASX), the Company is not aware of any new information
or data that materially affects the information included in the relevant market announcements.
FORWARD LOOKING STATEMENTS
This announcement may contain certain “forward-looking statements” which may not have been
based solely on historical facts but rather may be based on the Company’s current expectations about
future events and results. Where the Company expresses or implies an expectation or belief as to
future events or results, such expectation or belief is expressed in good faith and believed to have a
reasonable basis. However, forward looking statements are subject to risks, uncertainties,
assumptions and other factors which could cause actual results to differ materially from future results
expressed, projected or implied by such forward-looking statements. Readers should not place undue
reliance on forward looking information. The Company does not undertake any obligation to release
publicly any revisions to any “forward looking statement” to reflect events or circumstances after the
date of this report, or to reflect the occurrence of unanticipated events, except as may be required
under applicable securities laws.
ASX: BYH | bryah.au
6
APPENDIX 1
JORC Code, 2012 Edition – Table 1 Exploration Results (Summary from RPA NI43-101 Report 2011
and further information from Internal Review)
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Drilling
techniques
•
ASX: BYH | bryah.au
Nature and quality of
sampling (e.g. cut channels,
random chips, or specific
specialised industry standard
measurement
tools
appropriate to the minerals
under investigation, such as
down hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
Include
reference
to
measures taken to ensure
sample representivity and
the appropriate calibration
of any measurement tools or
systems used.
Aspects of the determination
of mineralisation that are
Material to the Public
Report.
In cases where ‘industry
standard’ work has been
done this would be relatively
simple
(e.g.
‘reverse
circulation drilling was used
to obtain 1m samples from
which 3 kg was pulverised to
produce a 30 g charge for fire
assay’). In other cases, more
may
be
explanation
required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralisation types (e.g.
submarine nodules) may
warrant
disclosure
of
detailed information.r
Drill type (e.g. core, reverse
circulation, open-hole
Commentary
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Nature and quality of sampling included soil sampling,
trenching, grab samples from boulders and diamond drill core
sampling.
Soil samples were grid based collected on cut grid lines spaced
at 25m intervals along lines spaced 100m apart.
Soil samples was air-dried, then sieved to -80 mesh prior to
analysis, to ensure consistency and remove larger particles or
organic debris.
Soil samples were analysed for gold and a suite of 34 elements
(including antimony – Sb) using ICP (Inductively Coupled
Plasma) following aqua regia digestion.
Trenching was across mineralised zones, the trenches were
sampled and mapped to aid diamond drilling. Channel
samples were consistent at 1m intervals.
Diamond drill core was logged and sampled. One half of the
core was sent for assay, while the other half was retained for
reference.
The diamond core sample intervals were typically 1.0 metre
where suitable but also vary depending on geological
boundaries, mineralization, and lithology.
Soil sampling approach was used to ensure consistent and
systematic coverage of the property. Soil samples were taken
from the B-horizon, which is typically found below the
organic-rich surface layer and is better suited for geochemical
analysis due to lower biological activity and more stable
chemistry.
Soil sampling techniques were employed to identify
geochemical anomalies indicative of potential mineralization
zones and to guide follow-up trenching and drilling programs.
Eight trenches for a total of about 227 linear metres in the
immediate area of the Golden Pike deposit and collected 35
channel and chip samples totalling 22.10m.
The diamond core samples were assayed for gold using fire
assay with atomic absorption finish. Samples with visible gold
were re-analysed.
The sampling process from 2008 onwards included rigorous
QA/QC inclusive of reference materials, blanks and duplicates
to assure accuracy.
Boulder samples were collected in the Bond Road area as grab
samples, where approximately 1kg samples were collected.
These samples are indicative only, due to poor outcrop
exposure and the point location nature of the sample
collected (ie, these were not cut channel samples
representing a cross section of outcrop).
Drill type involved Diamond Drilling techniques at NQ
diameter (47.6mm). Diamond drilling was employed
7
Criteria
Drill sample
recovery
JORC Code explanation
•
•
Logging
hammer, rotary air blast,
auger, Bangka, sonic, etc)
and details (e.g. core
diameter, triple or standard •
tube, depth of diamond
tails, face-sampling bit or
other type, whether core is
oriented and if so, by what
method, etc).
Method of recording and •
assessing core and chip
sample
recoveries
and
results assessed.
•
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
predominantly for collecting high-quality core samples and
provided continuous core samples allowing for detailed
geological and structural logging.
Diamond core recovery was generally good, with a full record
of recovery collected during processing of the core.
Diamond drill core recoveries were measured using the length
of core recovered versus the length drilled, recorded in core
logs. Recoveries were generally good.
At this stage no investigations have been made into whether
there is a relationship between sample recovery and grade.
•
Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
•
Whether core and chip •
samples
have
been
geologically
and
geotechnically logged to a
level of detail to support •
appropriate
Mineral
Resource estimation, mining
studies and metallurgical •
studies.
•
Whether logging is
qualitative or quantitative in
nature. Core (or costean,
channel, etc) photography.
The total length and
percentage of the relevant
intersections logged.
Core logging, geotechnical logging and support studies have
been geologically and geotechnically logged to a level of detail
to support appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Core logging is qualitative in nature and include description of
colour, grain size, mineralogy, alteration, structure, and
mineralization.
Logging included photographing and marking for sampling.
The procedures reflect standard industry practices that ensure
data reliability and geological understanding of the deposit.
If core, whether cut or sawn
and whether quarter, half or
all core taken.
If non-core, whether riffled,
tube sampled, rotary split,
etc and whether sampled
wet or dry.
For all sample types, the
nature, quality and
The diamond drill core was cut in half using a diamond saw.
One half of the core was sent for analysis, and the other half
was retained in the core box for future reference. The samples
were dry.
Geologists logged and marked the core for sampling based on
lithology, structure, alteration, and mineralisation. Sample
intervals were defined by visible mineralisation and geological
contacts
•
•
Sub-sampling
techniques and
sample
preparation
Commentary
•
•
•
ASX: BYH | bryah.au
•
•
8
Criteria
JORC Code explanation
•
•
•
Quality of assay •
data and
laboratory tests
•
•
appropriateness of the
sample preparation
technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure
that the sampling is
representative of the in-situ
material collected, including
for instance results for field
duplicate/second-half
sampling.
Whether sample sizes are
appropriate to the grain size
of the material being
sampled.
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters used in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their derivation, etc.
Nature of quality control
procedures adopted (e.g.
standards, blanks,
duplicates, external
laboratory checks) and
whether acceptable levels of
accuracy (i.e. lack of bias)
and precision have been
established.
Commentary
•
•
•
•
•
•
•
•
•
ASX: BYH | bryah.au
Sample interval lengths where sampled to geology: Range
from 0.3m to 1.5m
All core was photographed before sampling for archival
records.
Core was systematically laid out, verified for depth and
orientation, and reconstructed to ensure continuity.
The primary assaying methods used — fire assay with
gravimetric finish and screen metallics — are both total
digestion techniques, ensuring accurate and complete
extraction of gold for analysis. These methods are industry
standard, high quality, and appropriate for the style of gold
mineralization encountered at the Golden Pike Gold Project.
Multi-element data was collected with aqua regia digest and
ICP-MS determination for diamond core samples, and ICP-MS
or OES for soil multi-element determinations. Some core
samples from 2008 from Golden Pike were analysed for a 48
element suite by Instrumental Neutron Activation Analysis
(INAA) which is a non-destructive method of analysis.
Commercial gold standards were inserted approximately
every 20th sample (i.e., 1 in 20 frequency) from 2008
onwards. Multiple standard types with known gold
concentrations were used to test assay accuracy. Results were
plotted and reviewed to monitor laboratory performance.
Inert material blanks were inserted in the sample stream to
monitor contamination. Blanks were generally inserted after
visible gold samples to check for carryover. Blank results
consistently returned values below detection limit, confirming
no significant contamination. Field duplicates were collected
to test sampling precision. Additionally, pulp duplicates (reassaying of the same sample pulp) were performed.
Results from duplicate sampling showed acceptable
reproducibility.
Screen Metallics for High-Grade/Nuggety Samples applied to
samples assaying over 10 g/t Au to reduce the nugget effect
and improve representativity and precision with coarse and
fine fractions were analysed separately and recombined using
weighted averages.
A subset of samples (12 quarter-core intervals) was sent to
ALS Chemex in North Vancouver for independent check
assays. These were compared with ActLabs results.
9
Criteria
JORC Code explanation
Commentary
Overall, the external assays closely matched original assays,
confirming lack of bias and reinforcing confidence in accuracy
Verification of
sampling and
assaying
•
•
•
•
Location of
data points
•
•
•
The verification of significant
intersections by either
independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary
data, data entry procedures,
data verification, data
storage (physical and
electronic) protocols.
Discuss any adjustment to
assay data.
Accuracy and quality of
surveys used to locate drill
holes (collar and down-hole
surveys), trenches, mine
workings and other locations
used in Mineral Resource
estimation.
Specification of the grid
system used.
Quality and adequacy of
topographic control.
•
•
•
•
•
•
•
•
•
•
•
•
•
Data spacing
•
and distribution
•
ASX: BYH | bryah.au
Data spacing for reporting of •
Exploration Results.
Whether the data spacing
and distribution is sufficient •
to establish the degree of
geological and grade
continuity appropriate for
The use of twinned holes has not been implemented, but
several holes do pass within close range of each other in
mineralised areas drilled by Fosters Resources Ltd and
Rockport Mining Corp
Assay capping was applied during resource estimation to
manage high-grade outliers:
o Main Zone: gold assays capped at 40 g/t
o Parallel Zone: gold assays capped at 35 g/t
Capping was based on statistical analysis of assay distributions
to reduce the influence of extreme values.
These adjustments were made for resource modelling
purposes only.
No other alterations (e.g., averaging or substitution) were
applied to raw assay data.
Drill hole collars were located using handheld GPS units.
The reported accuracy for these measurements was
approximately ±5 metres, which is considered acceptable for
early-stage exploration.
The report does not provide detailed information on the
methods or tools used for down-hole surveys.
Diamond core logs include down-hole multi-shot survey
readings, with collar plan at True North and down hole
surveys at Magnetic North. The database has all holes
converted to True North, with adjustment for a magnetic
declination of 16.5 degrees.
The coordinate system used was NAD83, Zone 20, which is a
Universal Transverse Mercator (UTM) grid.
Topography for the project area was based on GPS
measurements and government topographic maps.
While the existing level of control is adequate for resource
estimation at the (Foreign Estimate) Inferred category, the
report acknowledges that higher precision surveys would be
needed for advancing the project to more detailed levels (e.g.,
Indicated or Measured resource classification). High quality
LIDAR data is available for download from the New Brunswick
government for the Project area and will be used for future
mineral resource work.
Elevation control was sufficient for defining drill collar heights
and relative trench elevations, but not suitable for mine
planning at advanced stages.
The drill holes on the Golden Pike property were generally
spaced 15m to 50m apart, depending on location within the
mineralized zones.
The Main Zone and Parallel Zone (including former Boyd,
Baxter, and 16 Zones) were the primary focus, with tighter
spacing in more heavily drilled areas.
10
Criteria
JORC Code explanation
•
the Mineral Resource and
Ore Reserve estimation
procedure(s) and
classifications applied.
Whether sample
compositing has been
applied.
Commentary
•
•
•
•
Orientation of
data in relation
to geological
structure
•
•
Sample security •
Whether the orientation of
sampling achieves unbiased
sampling of possible
structures and the extent to
which this is known,
considering the deposit
type.
If the relationship between
the drilling orientation and
the orientation of key
mineralised structures is
considered to have
introduced a sampling bias,
this should be assessed and
reported if material.
•
The measures taken to
ensure sample security.
•
•
•
•
•
•
•
•
•
•
•
Audits or
reviews
•
ASX: BYH | bryah.au
The results of any audits or
reviews of sampling
techniques and data.
•
RPA concluded that the data spacing and drill density are
sufficient to support the classification of the mineral resources
as Inferred, in accordance with CIM definitions.
The available drill hole information was deemed adequate to
interpret the geological and grade continuity of the
mineralized quartz-carbonate veining system.
RPA concluded that the data spacing and drill density are
sufficient to support the classification of the mineral resources
as (Foreign Estimate) Inferred, in accordance with CIM
definitions.
The available drill hole information was deemed adequate to
interpret the geological and grade continuity of the
mineralized quartz-carbonate veining system.
The drill holes were mostly inclined, targeting the mineralized
zones at a high angle.
RPA reported that the orientation of the drilling was
appropriate to intersect the vein structures close to
perpendicular, minimizing sampling bias.
For resource estimation, a minimum true thickness of two
metres was applied.
Drill intersections were used with knowledge of the
orientation to estimate true widths and prevent
overstatement of grades or widths.
Based on geological interpretation and cross-section analysis,
RPA concluded that the orientation of drilling and sampling is
unlikely to result in a significant bias in the reported grades or
geometry.
Drill core was transported daily from the drill site to
Rockport’s core logging facility in Sussex, New Brunswick by
company personnel.
After logging and sampling, samples were securely bagged
and tagged.
Each half-core sample was placed in a plastic sample bag
along with a sample tag. Bags were sealed to prevent
tampering.
Individual sample bags were grouped into rice bags for bulk
handling. These rice bags were sealed and stored in a locked
or supervised facility at the core shack until shipment.
A sample transmittal form listing all sample numbers and
corresponding information was prepared for each shipment.
This ensured complete traceability from the core shack to the
laboratory.
Samples were personally delivered by Rockport personnel to
Activation Laboratories (ActLabs) in Fredericton, New
Brunswick, for preparation and analysis.
An Independent Site Visit and Review by Roscoe Postle
Associates Inc RPA: was conducted on July 28–29, 2008 by
Paul Chamois, P.Geo. of. (RPA)
11
Criteria
JORC Code explanation
Commentary
•
•
•
•
•
•
During the visit, he examined drill core and trenches, reviewed
logging, sampling, and core handling procedures and
evaluated data management protocols.
RPA found that the sampling techniques and procedures were
professionally conducted and appropriate for the stage of
exploration.
RPA conducted a validation of the drill hole database,
checking for: out-of-sequence intervals; missing or duplicate
entries; assay inconsistencies
No significant errors were found and the database was
deemed suitable for use in Mineral Resource estimation.
A subset of 12 quarter-core samples from four drill holes was
sent to ALS Chemex for independent assay checks.
The results correlated well with the original assays from
Activation Laboratories (ActLabs), supporting the accuracy and
reliability of the primary data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
•
•
Exploration
done by other
parties
•
Commentary
Type, reference
•
name/number, location and
ownership including
•
agreements or material
issues with third parties such
as joint ventures,
partnerships, overriding
royalties, native title
interests, historical sites,
wilderness or national park
and environmental settings.
The security of the tenure
held at the time of reporting
along with any known
impediments to obtaining a
licence to operate in the
area.
Acknowledgment and
•
appraisal of exploration by
other parties.
•
•
ASX: BYH | bryah.au
The relevant claim is 100% owned by the Globex Mining
Enterprises.
At the time of reporting, there are no known impediments to
obtaining a licence to operate in the area.
Work on the property began with PGE Resources Corporation
(“PGE”) in 1989.
In 1990, Noranda optioned the property from PGE, exploration
consisted of drilling, trenching and rock chip sampling
In 1994, Fosters Resources Ltd. (“Fosters”) optioned the
property from PGE and drilled 16 holes for a total of 1,052m.
In 1995, Fosters drilled an additional 20 holes for a total of
1,327m over a strike length of about 120m and to a vertical
depth of 80m. In 1996, Fosters drilled an additional 20 holes
intended to extend the strike length and depth of the quartz
vein system and deepened three holes on the “Boyd” vein, for
12
Criteria
JORC Code explanation
Commentary
•
•
Geology
•
Deposit type, geological
setting and style of
mineralisation.
•
•
•
•
•
ASX: BYH | bryah.au
a total of 2,010m. In total, Fosters drilled 56 holes and three
extensions for 4,586m.
Rockport Mining Corporation (“Rockport”) optioned the
property in 2007 and initiated a comprehensive exploration
program consisting of line cutting, soil sampling, trenching,
and airborne and ground geophysical surveying. In 2007 and
2008, 3,130 B-horizon soil samples were collected by soil
auger and assayed for gold and analysed using multi element
ICP packages and excavated eight trenches for a total of about
227m in the immediate area of the Golden Pike deposit and
collected 35 channel and chip samples.oFrom December 2007
to September 2008, Rockport completed an 11,570.80m NQ
drilling program designed to test the Parallel and Main
zones of the Golden Pike Gold Deposit.
In 2011, Portage Minerals retained Roscoe Postle Associates
(RPA) to complete the National Instrument (NI) 43-101
Technical Report of the Gold Pike project (Chamois et al.,
2011) which at the time included part of the Devils Pike
property. A Mineral Resource of 214.8 Kt @ 9.60 g/t Au was
estimated in the Inferred Category for both Main and Parallel
zones. This is currently a Foreign Estimate for reporting in
Australia, with work in progress to complete an updated
mineral resource estimate that is JORC compliant.
The Golden Pike Gold deposit is located in south-central New
Brunswick, within the Appalachian Orogen. It lies near the
boundary between the Cambro-Ordovician Annidale Group (to
the northwest), and the Siluro-Devonian Mascarene Cover
Sequence (to the southeast). The geology units prospective for
Antimony mineralisation are hosted within the CambroOrdovician Annidale Gro
Share your feedback
Discover