Drill Program Commenced Golden Pike Gold & Antimony Project
Released
Released
Announcement PDF
Bryah Resources Limited
191B Carr Place
Leederville, WA 6007
Phone: +61 8 9321 0001
Email: info@bryah.au
ASX: BYH
ABN: 59 616 795 245
ASX ANNOUNCEMENT 27 NOVEMBER 2025
Drilling Program Commenced at Golden Pike
Gold and Antimony Project
HIGHLIGHTS
• Diamond drill rig has commenced drilling at the Vail Road high grade gold deposit
• Access and drill pad clearing work has commenced at Bond Road Antimony Prospect
• Technical and support staff have been mobilised to site
Bryah Resources Limited (“Bryah” or “the Company”) has commenced its planned drilling program at
its Golden Pike Gold and Antimony Project in New Brunswick, Canada.1 The first part of the drill
program is targeting infill and extensional drilling at the Vail Road high-grade gold deposit. Drill results
and data acquired will be utilised to upgrade the existing foreign resource estimate to a JORC
compliant mineral resource estimate. The program aims to acquire approximately 1000m of oriented
diamond core for this purpose.
CEO, Greg Hill comments, “It’s exciting to be commencing our inaugural drilling program at our
Canadian project. I am grateful to the Government of New Brunswick and for community support for
the project, which has enabled us to commence drilling within six months of acquiring the option over
the claims.”
On completion of drilling at the Vail Road gold deposit, the rig will be moved to the Bond Road area
to undertake an exploration program targeting high grade antimony veins within interpreted fault
structures. Up to 1200m of exploration drilling is planned across several hole locations.
Figure 1 – Drill rig at the Vail Road gold deposit
1
ASX announcement dated 17 November 2025 ‘Approvals Received for Gold & Antimony Drilling – Golden Pike’
ASX: BYH | bryah.au 2
The Company plans to complete both portions of the drilling program by the end of 2025. Processing
of drill core and sample analysis will commence as it becomes available from site and will continue
into January 2026.
For further information, please contact:
Greg Hill, CEO
+61 8 9321 0001
This announcement has been produced in accordance with the Company's published continuous
disclosure policy and has been approved by the Board.
ASX: BYH | bryah.au 3
ABOUT BRYAH RESOURCES
Bryah Resources Limited is in the process of changing its name to Albright Metals Limited.2 Bryah’s
current projects are located in Canada and Western Australia, both Tier One mining and exploration
jurisdictions.
Bryah has executed an agreement with Globex Mining Enterprises Inc. (GMX-TSX, GLBXF-OTCQX,
G1MN-FSE; “Globex”) to acquire the Golden Pike Gold and Antimony Project in New Brunswick,
Canada.3 The project covers approximately 3,292ha of contiguous mining claims which includes the
Vail Road high-grade gold deposit classified under NI 43-101,4 and the exploration-stage Bond Road
antimony prospect. The Golden Pike Project is in an area that is close to road, rail, port and grid power
infrastructure. Southern New Brunswick is on the Canadian east coast, adjacent to Maine, USA. It
enjoys a mild maritime climate, allowing year round exploration activities. The province has a mature
mining services industry and has historically produced antimony and gold from multiple mines.
The Company’s Bryah Basin licences cover 1,048km2 and hold potential for copper and gold. Bryah
also has a substantial $7M manganese joint venture on the licences with ASX listed OM Holdings
Limited (ASX: OMH), with OMH having already spent over $4.5 million to earn-in to the Manganese
Rights of the project.
Bryah holds a suite of mineral rights5 over the Gabanintha project, near Meekatharra, which has a
JORC 2012 Mineral Resource for Cu, Ni, Co and additional structural gold potential.
EXPLORATION RESULTS
Where the Company refers to Exploration Results in this announcement (referencing previous
releases made to the ASX), the Company is not aware of any new information or data that materially
affects the information included in the relevant market announcements.
FORWARD LOOKING STATEMENTS
This announcement may contain certain “forward-looking statements” which may not have been
based solely on historical facts, but rather may be based on the Company’s current expectations
about future events and results. Where the Company expresses or implies an expectation or belief as
to future events or results, such expectation or belief is expressed in good faith and believed to have
a reasonable basis. However, forward looking statements are subject to risks, uncertainties,
assumptions and other factors which could cause actual results to differ materially from future results
expressed, projected or implied by such forward-looking statements. Readers should not place undue
reliance on forward looking information. The Company does not undertake any obligation to release
publicly any revisions to any “forward looking statement” to reflect events or circumstances after the
date of this report, or to reflect the occurrence of unanticipated events, except as may be required
under applicable securities laws.
2
See ASX announcement 6 October 2025 ’Notice of AGM and Closing Date for Director Nominations’
3
See ASX announcement 11 July 2025 ‘Option Exercised to Acquire High-Grade Canadian Gold Project’
4
See ASX announcement 21 May 2025 ‘Acquisition of Advanced High-Grade Gold Project’
5
See ASX announcement 25 May 2022 ’36 Million Tonne Nickel-Copper-Cobalt Mineral Resource at Gabanintha’
Share your feedback
Discover