QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDING 31st March 2024
HIGHLIGHTS:
Lake Johnston Lithium-Nickel Project (100%)
•
•
•
•
•
Lithium soil anomaly up to 3km long and 1km wide defined in soil orientation lines at
Pegasus 1
Pegasus prospect approvals process in place ready to drill
Infill soil results of whole sample confirm anomally at Pegasus 2
Drilling to start ASAP
Mineral Resources (MinRes) have proposed a regional lithium processing facility with
the purchase of Poseidon’s Nickel’s Black Swan plant at Lake Johnston.
Bryah Basin Manganese Joint Venture Project (49% JV Interest)
•
Reviewing the current JORC resources at the Brumby Creek and Black Hill Prospects
on Mining licence granted last year.
Bryah Basin Copper-Gold Project (100%)
•
New copper and gold prospect areas under review.
Gabanintha Copper-Nickel Project (100%)
•
The collaboration between AVL and Bryah is focused on realising the significant
strategic value of the Ni, Co and Cu within the non-magnetic tailings fraction at the
Australian Vanadium Project.
Corporate
Cash position of $622,000 as at 31st March 2024.
This report summarises the exploration and corporate activities of Bryah Resources Limited (“Bryah”
or “the Company”) during the quarter ended 31st March 2024.
1
2
ASX:BYH announcement 22nd January 2024 First Drill Targets Defined By Soil Anomalies
ASX:BYH announcement 21st March 2024. Exploration Update
191B Carr Place
Leederville
WA 6005
Tel: +61 8 9321 0001
ABN: 59 616 795 245
ASX: BYH
bryah.com.au
Follow us on social media:
Management Comments
Commenting on the March quarter CEO Ashley Jones said,
“Bryah continued exploration on its Lake Johnston Lithium project following the strong 3 x 1km lithium
anomaly at Pegasus. Approvals and Heritage were completed and it will be an exciting anomaly to
drill.
A positive development for Bryah, was the MinRes acquisition of the Poseidon plant with the strategy
to make it a regional Lithium processing hub3. MinRes stated that they are open to third party
processing which means for Bryah any discovery, small or large, has a path to production.
We are looking forward to a productive quarter and delivering some results at the Lake Johnston
lithium project.”
EXPLORATION ACTIVITIES
Lake Johnston Lithium-Nickel
The Lake Johnston Project consists of nine granted exploration licenses, held by Bryah, and its 100%
owned subsidiary West Coast Minerals Pty Ltd.
A soil program completed in January 2024 identified the first drill target when results were interpreted
in January. Follow up infill soil samples were selected with which confirmed the anomalies 4. The
approvals process is well underway to commence drilling as soon as possible.
Figure 1 Pegasus soil sampling anomaly map with Li2O contours shown over GSWA 1:100,000 Interpreted Basement Geology
3
4
ASX announcement MinRes 18th March 2024. MinRes to develop lithium processing hub
ASX announcement BYH 21st March 2024 Exploration Update
ASX: BYH | bryah.com.au
2
Map
Figure 2 Pegasus infill whole soil sampling results over the soil Li2O anomaly contour map shown over GSWA 1:100,000
Interpreted Basement Geology Map.
The infill soil samples at Pegasus confirmed the large 3km by 1km eastern soil anomaly that was
reported in January 2024. The assays represent the complete soil sample, whereas previous samples
only took the -250micron portion. Lithium usually reports to the finer fraction; hence a better lithium
anomaly is often achieved with the fine fraction only assayed. The full geochemistry of the soil does
help identify differences in the correlations between elements and a fairer indication of the underlying
lithology. Our full soil assay continues to have excellent correlations between Li, Cs, Rb and Ga
indicating potential LCT pegmatites.
Soil sample collection continued from mid-January on high priority areas across the tenements E63/
2156, E63/ 2134, E63/ 2135, E63/ 2132, and infill on the soil anomaly on the Pegasus project tenement
E63/ 2159.
The Lake Johnston area continues to grow as a prospective lithium corridor with significant discoveries
made by Charger Metals (ASX CHR) at its Medcalf discovery and TG Metals Burmeister project. MinRes
have purchased the Poseidon Plant at Lake Johnston with a strategy to operate a regional lithium
processing hub3. MinRes states that they are open to third party processing which means for Bryah
any discovery, small or large, has a path to production. The Lake Johnston Project consists of nine
granted exploration licenses, held by Bryah, and its 100% owned subsidiary West Coast Minerals Pty
Ltd .
ASX: BYH | bryah.com.au
3
Figure 3 Bryah’s Lake Johnston Tenure
Bryah Basin Manganese Joint Venture (BYH - 49% JV Interest)
Bryah has been monitoring the Manganese price and completing a review of the metallurgical data
following the grant of the mining licences over all resources last year.
M52/ 1087
M52/ 1088
Winthorpe (Au)
Figure 4 - Mining Lease M52/ 1087 and M52/ 1088 within tenement holding.
ASX: BYH | bryah.com.au
4
Mining Lease
M52/ 1087
Figure 5 - Prospect locations with geology map showing the Horseshoe Formation
In April 2019, Bryah executed a Manganese Farm-In and Joint Venture Agreement (“JV Agreement”)
with OMM, a wholly owned subsidiary of ASX-listed OM Holdings Limited (ASX: OMH). The JV
Agreement applies to the rights to manganese only over approximately 600 km2 of the entire
tenement package held by the Company in the Bryah Basin. The Manganese JV includes the Horseshoe
South Manganese Mine, which is the largest historical manganese mine in the region.
ASX: BYH | bryah.com.au
5
Manganese Resource
Table 1 August 2023 Manganese Mineral Resource at 15% Mn Cut-off
2023 Estimate
Prospect
kt
Mn %
Fe %
Area 74
286
24.1
21.1
Brumby Creek
1,038
20.6
20.5
295
20.5
23.6
Redrum
429
19.2
22.7
Black Hill
24
29.7
20.2
2,072
20.9
21.5
16
18.0
23.5
276
18.5
24.4
351
19.5
29.9
351
18.0
23.8
Total Inferred
994
18.6
26.1
Total Mineral Resource
3,066
20.2
23.0
Horseshoe
Category
Indicated
Total Indicated
Area 74
Brumby Creek
Horseshoe
Inferred
Redrum
Note: Appropriate rounding applied. kt = 1,000 tonnes
Gabanintha Project (Mineral Rights – 100%)
On May 30th 2023 AVL finalised a $49M grant for its Australian Vanadium Project. Part of the grant
involves collaboration on realising the significant strategic value of the Ni, Co and Cu within the mine
tailings at the Project. Previous metallurgical test work has shown a floatation circuit can make a
sulphide concentrate of up to 6.3% base metals copper, cobalt and nickel 5. Importantly, throughout
the BFS, AVL has provisioned space in the plant design for the floatation circuit. Bryah benefits from
the portion of the grant to finalise studies, and benefits from the whole grant as it moves AVL closer
to developing the Australian Vanadium Project.
The Gabanintha Project covers ~80km2 approximately 40km south of Meekatharra in Western
Australia. Bryah holds the rights to all minerals except Vanadium, Uranium, Cobalt, Chromium,
Titanium, Lithium, Tantalum, Manganese & Iron Ore (“Excluded Minerals”), which are retained by
Australian Vanadium Limited (ASX: AVL).
JORC Resource Cu Ni
An Indicated and Inferred Base Metal Mineral Resource for the Project has been reported within the
high-grade vanadium domain, beneath the base of sulphide weathering, in the areas of highest drill
density (80 – 140 metre spaced drill lines with 30 metre drill centres). Base metals are potentially
5 See BYH ASX announcement dated 1st June 2021 ’31.3 Million Tonne Nickel-Copper-Cobalt Mineral Resource at
Gabanintha’
ASX: BYH | bryah.com.au
6
economically recoverable as a sulphide flotation of the tails produced through beneficiation of the
vanadium ore. Due to the reliance on concentration of the base metals into the non-magnetic tails
through beneficiation of the vanadium ore, the Indicated Mineral Resource is restricted to the highgrade domain within the pit optimisations from AVL’s Bankable Feasibility study (BFS). Inferred
Mineral Resource is located beneath the optimised pits in the vanadium high-grade domain within
classified vanadium Mineral Resources. Table 2 below outlines the resource by pit area.
Table 2: May 2022 Base Metals Mineral Resource Inventory at the Australian Vanadium Project 6
2022 Base Metals
Resource Area
Classification
Million Tonnes
(Mt)
Ni
ppm
Cu
ppm
Co
ppm
S%
In Pit North
Indicated
7.6
719
211
227
0.20
In Pit Central
Indicated
4.6
775
191
228
0.23
In Pit South
Indicated
3.8
834
220
264
0.11
Total In Pits
INDICATED
16.1
762
207
236
0.19
Under North Pit
Inferred
8.0
710
202
180
0.20
Under Central Pit
Inferred
3.5
755
197
231
0.25
Under and within
South Pit
Inferred
8.4
834
236
268
0.15
Total Under Pits
INFERRED
19.9
770
216
226
0.19
Total Base Metals
Resource
GLOBAL
36.0
766
212
231
0.19
The Indicated Mineral Resources portion is 16.1 Mt at 762 ppm Nickel, 207 ppm Copper and 236 ppm
Cobalt. This part of the resource falls entirely within the existing pit designs for the proposed 25 year
mine-life vanadium project and is expected to be processed through the 1.6 Mt per annum crushing,
milling and beneficiation plant. AVL’s BFS reports a reserve of 30.9 million tonnes. The base metal
resource portion of the 30.9 Mt of high-grade vanadium resource that is included in the pits is 16.1
Mt and represents ~52% of the total beneficiation plant feed.
The remaining Inferred Mineral Resource lies within the classified vanadium resource in the highgrade domain beneath the base of each of the designed pits where pit optimisations are currently drill
limited, highlighting the potential for future production.
Bryah Basin Copper-Gold Project (BYH – 100%)
The Bryah Basin project covers approximately 1,048km2 in central Western Australia. The project is
located close to several mining operations including the high-grade Volcanogenic Massive Sulphide
(VMS) DeGrussa copper-gold mine operated by Sandfire Resources NL (ASX: SFR) until May 2023 and
the Fortnum gold mine operated by Westgold Resources Limited (ASX: WGX).
6 ASX announcement 25th May 2022
ASX: BYH | bryah.com.au
7
Bryah’s tenements cover large areas of under-explored ground adjacent to the copper-gold deposit at
Horseshoe Lights, which is hosted in similar aged volcanic and sedimentary rocks to the DeGrussa
copper-gold mine. The Bryah Basin also has several historical and current manganese mines including
the Company’s Horseshoe South Manganese Mine.
Figure 6: Bryah Basin Project Location Plan
Downhole Electromagnetic Surveying
Reviews of the expansive datasets previously captured by Bryah Resources have been completed and
continue to be undertaken to attempt to gain additional insights and develop new targets. While these
reviews are still on going, there are several initial promising targets that may be investigated in the
coming field season.
Following on from the 2023 diamond drilling program Down-Hole Electro Magnetic (DHEM) surveys
were undertaken to investigate the potential for near miss mineralisation; in this case DHEM surveys
on the deep diamond drill holes at Windalah 7 resulted in no clear electrical conductor at depth. The
program consisted of down hole surveys of the Windalah and Olympus drill holes as well as two dipole
– dipole Induced Polarisation lines across the Olympus geochemical anomaly. The DHEM and dipole –
dipole Induced Polarisation lines across the Olympus also did not delineate an electrical conductor.
7
ASX announcement dated 19th May 2023 Windalah Copper-Gold Prospect Diamond Drilling Results
ASX: BYH | bryah.com.au
8
CORPORATE ACTIVITIES
Capital Structure
As at 31st March 2024, the Company had 435,453,523 ordinary shares on issue. 94,531,681 Listed
options exercisable at $0.035 expiring 1/12/2025 and 2,000,000 unlisted options exercisable at $0.054
expiring 12/08/2025. A General Meeting on 24th January approved the issue a further 47,990,199
Listed options exercisable at $0.035 expiring 1/12/2025 which were part of the November capital
placement.
Cash Position
As at 31st March 2024, the Company had $622,000 (31st December 2023: $1,040,000) in cash.
Additional ASX Information
During the quarter the Company spent $166k on exploration and evaluation expenditure, $120k of
which related to payments for soil sampling and geophysics. The balance of expenditure was allocated
between geological staff expenses, tenement management and general exploration expenditure.
No production and development activities were undertaken during the quarter.
The aggregate amount of payments to related parties and their associates included in Section 6.1 of
the Appendix 5B cash flows from operating activities was $55k for Directors’ fees.
The board of directors of Bryah Resources Limited has authorised this announcement to be given to
the ASX.
For further information, please contact:
Ashley Jones
Chief Executive Officer
Tel: +61 8 9321 0001
ASX: BYH | bryah.com.au
9
Table 3: Tenement Information
Tenement Information as Required by Listing Rule 5.3.3
For the Quarter Ended 31 March 2024
Location
Project
Tenements
Western Australia
Gabanintha
Western Australia
Bryah Basin
E51/843
E51/1534
M51/878
M51/888
MLA51/897
L51/112
P52/1527
E52/3014
E52/3236
E52/3237
E52/3238
E52/3240
E52/3349
E52/3401
E52/3453
E52/3454
E52/3508
E52/3700
E52/3705
E52/3726
E52/3703
E52/3739
E52/3725
E52/3796
E52/3848
E52/3865
E52/3898
E52/3963
M52/1068
E52/1557
E52/1860
M52/806
E52/ 4096
P52/1659
M52/1087
M52/1088
Economic
Interest
100%1,2
100%1,2
100%1,2
100%7
100%1,2
100%7
100%
100%
100%3,6
100%3,6
100%3
100%3,6
100%2,6
100%4,6
100%4
100%4
100%6
100%
100%
100%
100%
100%7
100%
100%
100%
100%
100%
100%
60%5
60%5
60%5
100%6
100% 6
100% 6
100%
100%
E63/2132
100%
E63/2134
E63/2135
E63/2155
E63/2156
E63/2157
E63/2158
E63/2159
E63/2361
100%
100%
100%
100%
100%
100%
100%
100%
Western Australia
ASX: BYH | bryah.com.au
Lake
Johnston
Notes
Manganese Rights only
Manganese Rights only
Manganese Rights only
Granted
Change in
Quarter %
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
100%
100%
100%
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
10
Note 1: Bryah Resources Limited holds the Mineral Rights for all minerals except V/U/Co/Cr/Ti/Li/Ta/Mn & iron ore only.
Australian Vanadium Limited retains 100% rights in V/U/Co/Cr/Ti/Li/Ta/Mn & iron ore on the Gabanintha Project.
Note 2: Australian Vanadium Limited retains a 0.75% Net Smelter Return Royalty
Note 3: Pet FC Pty Limited retains a 0.75% Net Smelter Return Royalty
Note 4: Jalein Pty Limited retains a 0.75% Net Smelter Return Royalty
Note 5: Bryah Resources Limited holds an 49% interest in the rights to prospect, explore, mine and develop manganese
ore (“Manganese Rights”). OM (Manganese) Limited has earned a 51% interest in these Manganese Rights.
Note 6: OM (Manganese) Limited has earned a 51% interest in the Manganese Mineral Rights only on these tenements
(southern portion of E52/3236 only). Bryah retains 100% rights to all other minerals on these tenements.
Note 7: As at 30th September 2023 Star Minerals Limited sale tenements were still in the process of transfer of
ownership.
About Bryah Resources Limited
Bryah’s assets are all located in Western Australia, a Tier One global mining and exploration
jurisdiction. Strategically the Projects are energy metals focused, or able to exploit synergies of
geological knowledge, locality and exploration.
The Lake Johnston tenements are prospective for battery metals lithium and nickel. The corridor near
Lake Johnston contains significant mines and discoveries of nickel and lithium, including the historical
Maggie Hays/Emily Ann nickel deposits and the TG Metals Burmeister Project and Charger Metals’
Medcalf Prospect.
The prospective Bryah Basin licences cover 1,048km2 and have a potential new Volcanogenic Massive
Sulphide (VMS) ‘Horseshoe Lights type’ mine analogue with multiple other untested targets. The area
also contains extensive outcroppings of manganese, the subject of a substantial $7M joint venture with
ASX listed OM Holdings Limited (ASX: OMH). OMH is a vertically integrated manganese producer and
refiner with a market capitalisation of ~$300m. Bryah and OMH have an excellent working
relationship, with OMH having already spent over $3.5 million to earn-in to the Manganese Rights of
the Project.
Gabanintha, near Meekatharra, has a JORC 2012 Mineral Resource for Cu, Ni, Co2 and additional
structural gold potential. The copper nickel resource and identified gold mineralisation at Gabanintha
will be the subject of further drill definition and a prefeasibility study to integrate the project with the
Australian Vanadium Project (ASX: AVL). The resource has been defined by the drilling efforts of AVL in
the development of its vanadium project and enabled Bryah to define a base metal resources
inventory.
Bryah’s base metals inventory at Gabanintha and manganese JV in the Bryah Basin have a clear
pathway to production.
Bryah holds 14.73% of gold focused Star Minerals (ASX:SMS). Star has a Mineral Resource at
Tumblegum South and exploration prospects in the West Bryah Basin.
ASX: BYH | bryah.com.au
11
Competent Persons Statement – Exploration Results
The information in this announcement that relates to Exploration Results is based on information
compiled by Mr Tony Standish, who is a Member of the Australian Institute of Geoscientists. Mr
Standish is a consultant to Bryah Resources Limited (“the Company”). Tony Standish has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Tony Standish consents to the inclusion in this announcement of the matters based on his information
in the form and context in which it appears.
Where the Company refers to Exploration Results in this announcement (referencing previous releases
made to the ASX), the Company is not aware of any new information or data that materially affects
the information included in the relevant market announcements.
Competent Person Statement — Mineral Resource Estimations
The information in this announcement that relates to Gabanintha Base metals Mineral Resources (see
BYH ASX announcement dated 25th May 2022) is based on and fairly represents information compiled
by Mr Lauritz Barnes, (Consultant with Trepanier Pty Ltd) and Mr Brian Davis (Consultant with
Geologica Pty Ltd). Mr Barnes and Mr Davis are both members of the Australasian Institute of Mining
and Metallurgy (AusIMM) and the Australian Institute of Geoscientists (AIG). Both have sufficient
experience of relevance to the styles of mineralisation and types of deposits under consideration, and
to the activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint
Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Specifically, Mr Barnes is the Competent Person for the estimation and
Mr Davis is the Competent Person for the database, geological model and site visits. Mr Barnes and
Mr Davis consent to the inclusion in this announcement of the matters based on their information in
the form and context in which they appear.
The information in this announcement that relates to Mineral Resources is based on and fairly
represents information compiled by Mr Lauritz Barnes, (Consultant with Trepanier Pty Ltd), and Ms
Gemma Lee (Principal Geologist with Bryah Resources). Mr Barnes and Ms Lee are members of the
Australasian Institute of Mining and Metallurgy (AusIMM) and/or the Australian Institute of
Geoscientists (AIG). Both have sufficient experience of relevance to the styles of mineralisation and
types of deposits under consideration, and to the activities undertaken to qualify as Competent
Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Specifically, Ms Lee is the
Competent Person for the geological model and site visits and for the geological database. Mr
Barnes is the Competent Person for the estimation. Mr Barnes, and Ms Lee consent to the inclusion in
this announcement of the matters based on their information in the form and context in which they
appear.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in these announcements and all material assumptions and technical parameters
underpinning the Mineral Resource estimates with those announcements continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent
Persons findings are presented have not materially changed from the original announcement.
ASX: BYH | bryah.com.au
12
Forward Looking Statements
This report may contain certain “forward-looking statements” which may not have been based solely
on historical facts, but rather may be based on the Company’s current expectations about future events
and results. Where the Company expresses or implies an expectation or belief as to future events or
results, such expectation or belief is expressed in good faith and believed to have a reasonable basis.
However, forward looking statements are subject to risks, uncertainties, assumptions and other factors
which could cause actual results to differ materially from future results expressed, projected or implied
by such forward-looking statements. Readers should not place undue reliance on forward looking
information. The Company does not undertake any obligation to release publicly any revisions to any
“forward looking statement” to reflect events or circumstances after the date of this report, or to
reflect the occurrence of unanticipated events, except as may be required under applicable securities
laws.
ASX: BYH | bryah.com.au
13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BRYAH RESOURCES LIMITED
ABN
Quarter ended (“current quarter”)
59 616 795 245
31 MARCH 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(166)
(605)
(b) development
-
-
(c) production
-
-
(d) staff costs
(86)
(298)
(e) administration and corporate costs
(150)
(538)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other
(1)
3
1.9
Net cash from / (used in) operating
activities
(402)
(1,437)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(18)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(18)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
1,224
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(9)
(101)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(7)
(51)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(16)
1,072
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,040
1,005
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(402)
(1,437)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(18)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(16)
1,072
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
622
622
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
622
1,040
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
622
1,040
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
55
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(402)
8.4
Cash and cash equivalents at quarter end (item 4.6)
622
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(402)
-
622
1.55
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
No, exploration will be completed at the Lake Johnston tenements and expenditure reduced
or increased in line with funding available.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
The Company has a successful record of raising required funding, as necessary, to
continue its exploration activities.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes. Direct costs and exploration expenditure can be adjusted, where necessary, as the
majority of these costs are discretionary. As per 8.8.1 and 8.8.2 cashflows will be in line with
the expected timing of any capital raising.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.