Windalah Copper-Gold Prospect Diamond Drilling Results
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
19TH MAY 2023
Windalah Copper – Gold Prospect
Diamond Drilling Results
HIGHLIGHTS
Results received for 717m diamond drilling program completed in late 2022.
Best results include:
o 2m @ 3.88 g/t Au from 437m in BBRD072
o 1m @ 0.35% Cu from 429m in BBRD072
Targeting Cu-Au VMS mineralisation at 300m and 500m depth
Deep VMS targets are a product of multiple lines of strong geological evidence.
Downhole electromagnetic surveys to test for off-hole conductors anticipated to commence
in H2 2023.
WA State Government EIS Co-funding for $140,000 1
Bryah Resources Limited (ASX: BYH, “Bryah” or “the Company”) is pleased to announce that it has
received results from its diamond drilling programme at the Bryah Basin Windalah copper-gold
project. Bryah was granted $140,000 under the Western Australian Government’s EIS (Exploration
Incentive Scheme) to test the Windalah VMS target.
Commenting on the announcement Bryah CEO Ashley Jones said:
We have again strong indications of copper in the system, especially with secondary copper
mineralisation observed in the core. These deep holes now are the focus for the down hole
electromagnetic (DHEM) surveys. The DHEM can identify conductors, which will show any copper
mineralisation withing the vicinity. Depending on the orientation, the DHEM will search up to 150m
radius around the holes. This will cover a lot of the prospective area. Any sign of a conductor will
establish new drill targets.”
1
See ASX announcement dated 2nd May 2022 ‘Bryah Secures $140,000 Drilling Grant’
Bryah Resources Limited
Level 2, 50 Kings Park Road
West Perth, WA 6005
Phone: +61 8 9321 0001
Email: info@bryah.com.au
ASX: BYH
ABN: 59 616 795 245
Figure 1 Bryah Basin Tenements and Regional Geology Map.
Windalah Diamond Drilling
During this EIS co-funded drilling programme, Bryah completed 1261m of drilling, including 544m
of precollars, and 717m of NQ2 diamond core tails. These holes were drilled to test a steeply
plunging target window targeting Cu-Au VMS mineralisation at ~300 and ~500m depth. These
drillholes intersected substantial thickness of strongly silica-sericite-pyrite altered volcanic rocks
similar to those observed in shallower holes, in the footwall to sulphide mineralisation. This is
interpreted to be the lateral equivalent of the ‘ore stratigraphic horizon’ at Horseshoe Lights.
With previous drilling campaigns, Bryah has recognised the significance of the Windalah project
through technical analysis which shows:
•
•
•
High tenor geochemical anomaly in surface sampling and drilling results
Up to 5.45m of massive, laminated sulphides interpreted as sedimentary exhalative in origin
Up to 140m of sulphide stringers observed in diamond core interpreted as VMS style
stringers within a silica-sericite-chlorite-pyrite altered feeder structure 2
See ASX announcement dated 12th April 2022 ‘Volcanogenic Massive Sulphide (VMS) system with copper-gold
potential confirmed at Windalah
2
ASX: BYH | bryah.com.au
2
•
•
Evidence of syn-volcanic faulting and stratigraphic asymmetry – common in VMS
mineralisation systems.
Secondary copper minerals including Bornite, Chalcopyrite and Malachite observed.Error!
Bookmark not defined.
•
•
•
Structural intersection of syn-VMS veins and stratigraphy indicate plunging target
orientation.
The Narracoota Formation is host to other major copper deposits including DeGrussa, and
Horseshoe Lights.
Evidence of VMS mineralisation also identified at the near-by Olympus prospect. 3
VMS systems in the Bryah Basin are known to host high-grade copper-gold deposits such as
Sandfire’s DeGrussa and Monty mines and the historical Horseshoe Lights mine, located 13
kilometres to the north of Bryah’s Windalah Prospect. The exploration target at Windalah occupies
the same stratigraphic position as the Horseshoe Lights deposit.
The Current geological model and targeting hypothesis remain the same. A massive, laminated
sulphide horizon is thought to occur along the intersection of a footwall stringer zone and the ‘ore
stratigraphic horizon’ – the equivalent stratigraphic position of the nearby Horseshoe Lights Cu-Au
mine. Bryah believes that following structural, geological, geochemical and hyperspectral vectors
will lead to the discovery of Cu sulphides at greater depth than current drilling.
See ASX announcement dated 13th September 2022 ‘Olympus Prospect confirmed VMS type Copper-Gold from Cofunded drilling’
3
ASX: BYH | bryah.com.au
3
Figure 2: Schematic geological map of the Windalah prospect showing the plunging target zone and BBRD072 and BBRD076.
ASX: BYH | bryah.com.au
4
Figure 3: Cross section showing significant intercepts from this drilling.
Current deep drilling at Windalah has focussed on a narrow window of the prospective plunging
target zone. The holes were strategically designed to cover both down dip and lateral extent with
respect to the following DHEM surveys. The upcoming DHEM survey will allow us to cover much
more of the target zone.
NEXT STEPS
The next steps for the Windalah copper-gold project are:
•
•
Downhole Electromagnetic Surveys (DHEM)
Renewed geological interpretation and targeting
Additional Cu-Au Exploration to be completed elsewhere in the Bryah Basin:
•
Bryah is a successful applicant in Round 26 of the (EIS), with a commitment of up to
$165,000 4 co-funded RC drilling at several other Windalah-type soil geochemical anomalies
in the Aquarius Trend.
Downhole Electromagnetic Surveying
4
See ASX announcement dated 20th October 2022 ‘Bryah Secure $165,000 Grant for Drilling’
ASX: BYH | bryah.com.au
5
It is anticipated that downhole electromagnetic (DHEM) surveying will be undertaken on the full
length of BBRD072 and BBRD076 (includes RC precollar and diamond tail) in H2 2023. A total length
of 1261m of drillhole will be surveyed.
Figure 4: Schematic geological map of the Windalah prospect showing approximate 50, 100, and 150 metre search radius/DHEM
coverage.
For further information, please contact:
Ashley Jones, CEO +61 8 9321 0001
This announcement has been produced in accordance with the Company's published continuous
disclosure policy and has been approved by the Board
ASX: BYH | bryah.com.au
6
ABOUT BRYAH RESOURCES
Bryah’s assets are all located in Western Australia, a Tier One global mining and exploration
jurisdiction. Strategically the Projects are energy metals focused, or able to exploit synergies of
geological knowledge, locality and exploration.
The prospective Bryah Basin licences cover 1,048km2 and have a potential new Volcanogenic
Massive Sulphide (VMS) ‘Horseshoe Lights type’ mine analogue at the Windalah prospect, and
multiple other similar untested targets. The area also contains extensive outcroppings of
manganese, the subject of a substantial $7M joint venture with ASX listed OM Holdings Limited
(ASX: OMH). OMH is a vertically integrated manganese producer and refiner with a market
capitalisation of over $490m. Bryah and OMH have an excellent working relationship, with OMH
having already spent over $3 million to earn-in to the Manganese Rights of the Project.
Gabanintha, near Meekatharra, has a JORC 2012 Mineral Resource for Cu, Ni, Co 5 and additional
structural gold potential. The copper nickel resource and recently identified gold mineralisation at
Gabanintha will be the subject of further drill definition and a prefeasibility study to integrate the
project with the Australian Vanadium Project (ASX: AVL). The resource has been defined by the
drilling efforts of AVL in the development of its vanadium project and enabled Bryah to define a
base metal resources inventory.
Bryah’s base metals inventory at Gabanintha and manganese JV in the Bryah Basin have a clear
pathway to production, which will be significantly advanced in 2023 by the commencement and
completion of metallurgical feasibility studies at both projects.
An option agreement has been signed over the Lake Johnston tenements which are prospective for
battery metals lithium and nickel. On IPO the option holder Mining Green Metals Ltd will pay 5
million shares for 70% of the project, with another 5 million shares for the remaining 30%. The
corridor near Lake Johnston contains significant mines and discoveries of nickel and lithium,
including the Mount Holland Lithium Mine and the historical Maggie Hays/Emily Ann nickel deposits.
Bryah holds 20.75% of gold focused Star Minerals (ASX:SMS). Star has a Mineral Resource at
Tumblegum South and exploration prospects in the West Bryah Basin.
5
See ASX announcement dated 25th May 2022 ‘36.0 MT Ni-Cu-Co Mineral Resource at Gabanintha
ASX: BYH | bryah.com.au
7
Forward Looking Statements
This report may contain certain “forward-looking statements” which may not have been based solely on
historical facts, but rather may be based on the Company’s current expectations about future events and
results. Where the Company expresses or implies an expectation or belief as to future events or results, such
expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward
looking statements are subject to risks, uncertainties, assumptions and other factors which could cause actual
results to differ materially from future results expressed, projected or implied by such forward-looking
statements. Readers should not place undue reliance on forward looking information. The Company does not
undertake any obligation to release publicly any revisions to any “forward looking statement” to reflect events
or circumstances after the date of this report, or to reflect the occurrence of unanticipated events, except as
may be required under applicable securities laws.
COMPETENT PERSON STATEMENT – EXPLORATION RESULTS AND EXPLORATION TARGETS
The information in this announcement that relates to Exploration Results is based on information compiled
by Mr Tony Standish, who is a Member of the Australian Institute of Geoscientists. Mr Standish is a consultant
to Bryah Resources Limited (“the Company”). Tony Standish has sufficient experience which is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Tony Standish consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in announcements referred to and all material assumptions and technical parameters
underpinning exploration results and Mineral Resource estimates within those announcements continue to
apply and have not materially changed. The Company confirms that the form and context in which the
Competent Persons findings are presented have not materially changed from the original announcement.
ASX: BYH | bryah.com.au
8
Appendix 1 – Drillhole Collar Information and Significant Intercept Table
DRILL HOLE INFORMATION
Hole ID
Easting mE
Northing mN
RL (m)
Dip
Azimuth
RC
Precollar
Depth
(m)
BBRD072
665509
7180249
545.4
-66.7
030
359
652.05
BBRD076
665510
7180250
545.4
-71.1
044
185
609.60
EOH
Depth
(m)
SIGNIFICANT INTERCEPT TABLE
Hole ID
BBRD072
BBRD076
From
(m)
To
(m)
Interval (m)
Cu
(%)
Au
(ppm)
429
430
1
0.35
0.03
437
439
2
0.05
3.88
450
451
1
0.001
0.24
Bryah Resources Limited
Level 2, 50 Kings Park Road
West Perth, WA 6005
Phone: +61 8 9321 0001
Email: info@bryah.com.au
ASX: BYH
ABN: 59 616 795 245
Appendix 2 - JORC Code, 2012 Edition – Table 1 Exploration Results
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
•
•
Drilling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
Aspects of the determination of mineralisation that are
Material to the Public Report.
•
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
•
ASX: BYH | bryah.com.au
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and
if so, by what method, etc).
Commentary
•
All diamond drilling (DDH) core was sampled by quarter core.
•
DDH drilling was to generally accepted industry standard with quarter
core submitted to Intertek Genalysis for photon assay gold and ICP-MS
copper analysis after four acid digestion.
•
Core was cut and sampled in Perth using an Almonte core saw and
blades.
•
Holes were sampled at regular 1m intervals, at the end of hole, the final
sample intervals may be shorter or longer up to a maximum of 1.3m.
Core was cut and quarter core placed into calico bags with the draw
string tied up and placed immediately into Bulka bags for delivery to
Intertek Genalysis.
•
Samples were delivered to Intertek Genalysis, Maddington for sorting,
drying, crushing, splitting, and pulverising followed by gold analysis by
photon assay. Copper data was acquired by ICP-MS after a four acid
digestion.
•
Only Narracoota Formation rocks (and a few metres into the Ravelstone
Formation hanging wall) were sampled during this programme.
•
Bryah Resources’ DDH holes were drilled with a contract DDH drilling
rig.
•
Precollars were completed with a contract RC drilling rig.
•
Two diamond holes were drilled during this programme. All diamond
core tails were drilled with NQ2 coring.
10
Criteria
Drill sample
recovery
Logging
JORC Code explanation
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
•
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Commentary
•
All core was orientated using a reflex downhole orientation tool supplied
and used by the contract DDH drilling crew.
•
Depth of RC precollars and DDH tails are outlined within this
announcement.
•
The RC samples were not weighed or measured for recovery on the rig
but will be completed on a campaign basis later as required. A visual
estimate of recovery was made in %.
•
DDH core recovery was measured for each run. For any incidences of
core loss, sample intervals were stopped and resumed after core loss.
•
To ensure maximum sample recovery and representivity of the samples,
an experienced Company geologist was present during drilling to
monitor the sampling process. Any issues were immediately rectified.
•
No RC samples were assayed at this stage. Samples have been stored
for potential use down the line.
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
•
All the 1m RC samples were sieved and collected into 20m chip trays for
geological logging of colour, weathering, lithology, alteration and
mineralisation for potential Mineral Resource estimation and mining
studies.
•
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
•
RC logging is both qualitative and quantitative in nature.
•
The total length and percentage of the relevant intersections
logged.
•
The total length of the RC holes was logged. Where no sample was
returned due to cavities/voids it was recorded as such.
•
All DDH core was organised into plastic core trays for geological logging
of colour, weathering, lithology, alteration and mineralisation (to a
minimum of 0.1m) for potential Mineral Resource estimation and mining
studies.
•
DDH logging is both qualitative and quantitative in nature.
ASX: BYH | bryah.com.au
11
Criteria
Sub-sampling
techniques
and sample
preparation
JORC Code explanation
•
If core, whether cut or sawn and whether quarter, half or all
core taken.
•
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
Commentary
•
Sampling technique:
o
All RC samples were collected by the RC rig into a cyclone and
then passed through the cone splitter.
o
The samples were generally dry, and all attempts were made to
ensure the collected samples were dry. Moisture was logged in a
qualitative way.
•
For all sample types, the nature, quality, and appropriateness
of the sample preparation technique.
•
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
o
The cyclone and cone splitter were cleaned with compressed air at
the end of every 6m RC drill rod.
•
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicate/second-half sampling.
o
•
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The sample sizes were appropriate to correctly represent the
mineralisation based on the style of mineralisation, the thickness
and consistency of intersections, the sampling methodology and
percent value assay ranges for the primary elements.
o
All DDH core was cut in Perth using a rented Almonte core saw.
o
quarter core was submitted to the lab. A quarter of core below the
orientation line was submitted the lab, preserving the orientation
line for storage. The same quarter was submitted for the full
duration of the sampling interval.
o
Quality Control Procedures were:
o
No field duplicates were completed. Lab duplicate checks were
completed on core.
o
Certified Reference Material (CRM) samples were inserted
randomly into the sample sequence at an average insertion rate of
~12.5%
o
CRM comprised samples with varying copper and gold values as
well as blank material.
o
Laboratory repeats taken and standard inserted at pre-determined
levels specified by the labs own procedure.
ASX: BYH | bryah.com.au
12
Criteria
JORC Code explanation
Commentary
•
Sample preparation at the laboratory for copper assay: The samples are
weighed and dried at 105oC, then coarsely crushed to -6.3mm using a
jaw crusher. If the sample size is greater than 2.5kg the samples are
then riffle split. Samples are then pulverised by LM5 or disc pulveriser to
80% passing -75 microns
•
Sample preparation at the laboratory for Gold assay: The samples are
weighed and dried at 105oC, then coarsely crushed to -6.3mm using a
jaw crusher. If the sample size is greater than 2.5kg the samples are
then riffle split. Samples are subsequently placed into plastic containers
and passed through the Chrysos Photon Assay machine.
The sample sizes are considered appropriate to correctly represent the
mineralisation based on the style of mineralisation, the thickness and
consistency of intersections, the sampling methodology and the assay
value ranges expected for copper and gold.
•
Quality of
assay data
and
laboratory
tests
Verification of
sampling and
assaying
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
•
Samples sent for analysis at Intertek Genalysis, Maddington were
assayed using four acid digestion with ICP-MS finish for copper and
photon assay for Au at a minimum lab detection limit of 0.01ppm.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
•
Gold by photon assay and copper by ICP-MS is suitable for the total
analysis of a range of geological ores and is appropriate for analysis of
copper and gold.
Samples containing standards were included in the analyses.
•
•
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
•
The verification of significant intersections by either
independent or alternative company personnel.
•
Significant intersections have been independently verified by alternative
company personnel.
•
The use of twinned holes.
•
The use of twinned holes has not been implemented.
ASX: BYH | bryah.com.au
13
Criteria
Location of
data points
Data spacing
and
distribution
JORC Code explanation
Commentary
•
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
•
The Competent Person has visited the site and supervised and
inspected the drilling and sampling processes in the field.
•
Discuss any adjustment to assay data.
•
All primary data related to logging and sampling were captured in
LogChief geoscientific logging software.
•
All data is sent to Perth and stored in the centralised Access database
with a Data Shed front end which is managed by company geologists.
•
No adjustments or calibrations have been made to any assay data, apart
from resetting below detection values to half positive detection.
•
All collars have currently been surveyed with a handheld GPS by Bryah
staff and will be independently surveyed by surveyors using a differential
GPS for accurate collar location and RL. The digital data has been
entered directly into the company Access database.
•
Downhole surveys have been completed on all the RC and DDH drill
holes by the drillers. They used a Reflex gyro tool kit with a survey
measurement collected every 5m down the hole.
•
The grid system for the Bryah Basin prospect is MGA_GDA20 Zone 50.
•
Topographic control is from a digital elevation model derived from aerial
geophysical surveys at 0.15m resolution.
•
There was some minor variation in the drill spacing and drillhole
orientation. Working around inferred folded stratigraphy.
•
The drill spacing in this program is not sufficient information to establish
the degree of geological and grade continuity applied under the 2012
JORC code for a mineral resource.
•
Sample compositing has not been applied. Samples have been taken at
irregular intervals from 0.6m to 1.05m.
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
•
Whether sample compositing has been applied.
ASX: BYH | bryah.com.au
14
Criteria
Orientation of
data in
relation to
geological
structure
JORC Code explanation
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
•
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
•
Audits or
reviews
•
ASX: BYH | bryah.com.au
The measures taken to ensure sample security.
The results of any audits or reviews of sampling techniques
and data.
Commentary
•
The attitude of the lithological units varies greatly At Windalah due to
complex regional folding.
•
The volcano-sedimentary sequence at Windalah is located on the
southern limb of a large regional anticlinal dome structure and strikes
roughly WNW-ESE.
•
The stratigraphy also shows evidence of parasitic folding that results in
varying orientation along strike.
•
Sulphide mineralisation occurs in two main domains: a) massive,
laminated sulphides striking ~parallel to stratigraphy; b) discordant
laminated quartz-pyrite-chlorite veining and pyrite stringers at high angle
to stratigraphy.
•
No drilling orientation and sampling bias has been recognized at this
time and it is not considered to have introduced a sampling bias.
•
The samples collected were placed in calico bags and transported to the
relevant Perth laboratory by company personnel on the back of a
company vehicle.
•
Sample security was not considered a significant risk.
•
The Company database has been compiled from primary data by
independent database consultants and was based on original assay
data and historical database compilations.
•
A regular review of the data and sampling techniques is carried out
internally.
15
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
Geology
JORC Code explanation
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
•
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
•
Acknowledgment and appraisal of exploration by other parties.
•
ASX: BYH | bryah.com.au
Commentary
Deposit type, geological setting, and style of mineralisation.
16
•
The relevant tenements drilled in this program (E52/3236)
are 100% owned by Bryah Resources Limited. At the time
of reporting, there are no known impediments to obtaining
a licence to operate in the area and the tenements are in
good standing.
•
Previous exploration at the Windalah Prospect has been
undertaken by Homestake Australia Limited (1984-1986)
and Afmeco Pty Ltd (1988-1990) and involved
aeromagnetic surveys, geological mapping, soil and rock
chip sampling and RAB drilling.
•
Explorers in all cases identified the prospectivity of the
ground however exploration results were not generally
followed up due to various issues.
•
The Windalah Prospect consists of a sequence of folded
sub-cropping Narracoota Formation within a series of
North-West trending, anticlinal domes. The Narracoota
Formation volcanics occupy the central axis position of
the interpreted dome structures. An overlying ridge
forming chert is strata-parallel and its distribution is
consistent with the dome structures and generally dips
away from the central fold axis. Overlying the chert
sequence and the underlying Narracoota Formation are
sediments of the Ravelstone Formation.
•
Windalah is a high sulphidation volcanogenic massive
sulphide (VMS) prospect located at the contact between
the Upper Narracoota Formation volcanics and the
Criteria
JORC Code explanation
Commentary
Ravelstone Formation sediments. Mineralisation consists
of a laminated exhalative massive sulphide. Footwall
mineralisation consists of laminated quartz-pyrite chlorite
veins in intensely silica-sericite altered rocks.
Drill hole
Information
Data
aggregation
methods
•
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in m) of
the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
•
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
•
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
ASX: BYH | bryah.com.au
17
•
The target is VMS mineralisation similar to the nearby
Horseshoe Lights Copper-Gold Mine where mineralisation
occurs in the core of a NNW trending and SE plunging
parasitic anticline, that is overturned. The sulphide
envelope of the deposit itself is SW dipping and plunging
to the SSE (150o) and was likely folded. It sits within
altered basalt and mafic volcaniclastic units along the
contact with overlying felsic volcanic schist.
•
Refer to Table 1 and 2 of this ASX Announcement for
details of sample locations, etc.
•
No high-grade cuts have been applied to the reporting of
exploration results.
•
No metal equivalent values have been used.
Criteria
JORC Code explanation
•
Where aggregate intercepts incorporate short lengths of high-grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
•
Share your feedback