Company Presentation
Released
Released
Announcement PDF
ASX: BYH
October 2025
Antimony Critical Mineral
and Mining Industry
Growth Potential –
Golden Pike Project
GOLDEN PIKE
EXPLORATION, MINING & PETROLEUM
CONFERENCE
Foreign Estimate Statements
The Foreign Estimate of the deposit for the Golden Pike Gold Project referred to in this presentation was completed in 2011 for Portage Minerals Inc. The estimate was
prepared in accordance with Canadian N43 - 101 but has been treated as a foreign estimate as a competent person has not undertaken sufficient work to classify the
estimates in accordance with the JORC Code 2012 and the ASX listing rules and has not signed off on the estimate as a JORC Code mineral resource. It is uncertain whether
following evaluation and further exploration work that the historical estimates will be able to be reported as mineral resources in accordance with the JORC Code.
The information in this announcement that relates to the Foreign Estimate in respect of the Mineral Claim is based on information compiled by Mr Ashley Jones, who is a
member of the Australasian Institute of Mining and Metallurgy (AusIMM) and qualifies as a ‘Competent Person’. Mr Jones is a director of Bryah Resources Limited. Mr Jones
confirms that the information contained in this announcement about the Foreign Estimate is an accurate representation of the available data and studies for the Mineral Claim.
Forward Looking Statements
This presentation is for information purposes only. Neither this document nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in
relation to the purchase or sale of shares in any jurisdiction. This Presentation may not be distributed in any jurisdiction except in accordance with the legal requirements
applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of
securities laws in such jurisdiction. This document does not constitute investment advice and has been prepared without taking into account the recipient’s investment
objectives, financial circumstances or particular needs and the opinions and recommendations in this representation are not intended to represent recommendations of
particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks,
which include (among others) the risk of adverse or unanticipated market, financial or political developments. No responsibility for any errors or omissions from this document
arising out of negligence or otherwise is accepted.
The presentation contains “forward-looking information” within the meaning of applicable securities legislation. Forward-looking information may include, but is not limited to,
information with respect to the future financial and operating performance of the Company, its affiliates and subsidiaries, potential investments, the estimation of mineral
reserves and mineral resources, realisation of mineral reserves and resource estimates, costs and timing of development of the Company’s projects, costs and timing of future
exploration, timing and receipt of approvals, consents and permits under applicable legislation, results of future exploration and drilling and adequacy of financial resources.
Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management of the Company made in light of their experience and
their perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the
circumstances at the date that such statements are made, but which may prove to be incorrect. The Company believes that the assumptions and expectations reflected in
such forward-looking information are reasonable.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information,
there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as
actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking
information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
2
COMPETENT PERSON’S STATEMENT & DISCLAIMER
ASX: BYH
COMPANY OVERVIEW
CORPORATE
Golden Pike mineral claims were optioned from Globex
Mining Enterprises Inc (Globex) in July 2025.1
Strategic rationale is that the Golden Pike Project
includes the advanced stage and defined gold mineral
resource at Vail Road.
Development of the Vail Road deposit would provide
funding for reinvestment into further developments.
The Company holds over 1,000km2 of exploration
tenements in the Bryah Basin in Western Australia
which are highly prospective for gold and copper.
The Company holds 40% of a manganese joint
venture project in the Bryah Basin.
Bryah Resources Limited (ASX: BYH) is a mineral exploration
company based in Western Australia.
1Source: ASX announcement dated 11 July 2025 ‘Option Exercised to Acquire
High-Grade Canadian Gold Project’
ASX: BYH
As two of the top mining jurisdictions in the world, Canada and Australia have many
similarities, but also some practical differences.
JURISDICTIONS
CANADA AND AUSTRALIA
SIMILARITIES DIFFERENCES
Government reporting requirements, with
exploration data collected to be used by other
parties following a brief closed file period
Drill methods – Australians routinely use
reverse circulation (RC) for initial exploration;
Canadians prefer diamond (DDH) drilling
Strong government support for mining
industry, including availability of Open GIS
data from government geological surveys
Outdoor work safety – very different climates,
with extreme heat in Australia and extreme
cold in Canada
Well developed mining services industries to
support mining projects through their
lifecycle, such as drillers, geological services
and accredited laboratories
Water availability for exploration drilling –
readily available in Canada; scarce and
expensive to cart in Australia (hence water
return used during DDH drilling)
Stable regulatory framework for exploration
and development activities, with high ESG
standards, including environmental protection
and First Nations engagement processes
In Australia infrastructure to support new
mines often has to be developed from scratch
and is then privately owned; parts of Canada
have good infrastructure that can support
mines, like publicly accessible rail
infrastructure
ASX: BYH
Claim Group (7616) covers 3,292 ha in south-
central New Brunswick.
The project includes the Vail Road gold deposit,
the Bond Road antimony prospect and the
Albright Brook gold and antimony prospect.
Other gold and antimony prospects exist that
warrant follow up work, defined by extensive soil
sampling surveys and drilling.
The project has a comprehensive exploration
dataset, including trenching, rock chip sampling,
soil geochemical surveys, exploration drilling and
geophysical surveys.
Exploration has focussed primarily on gold and
includes approximately 20,000m of diamond
drilling on the Vail Road gold deposit.
GOLD & ANTIMONY
GOLDEN PIKE
ASX: BYH
The Vail Road gold deposit has an NI 43-101
Estimate of 214.8kt @ 9.6g/t Au for 66,300 oz
modelled from a high cut-off grade of 5g/t Au and at
a time when gold price was ~USD1,500 per ounce.
Drilling at the deposit has resulted in high grade
down-hole width intersections with visible gold in
core.
For example, drill hole DP-07-04 (pictured) recorded:
10m @ 32.26g/t Au from 83.94m including
4.65m @ 75.9g/t Au from 86.85m
The Vail Road deposit remains open in multiple
directions.
HIGH GRADE GOLD
GOLDEN PIKE
2011 NI 43-101 Technical Report, Roscoe Postle Associates Inc., 19 August 2011
For parties viewing this presentation outside Canada, the Estimate of the deposit for the Golden Pike Gold Project (Vail Road Deposit) referred to in this presentation is considered a Foreign Estimate and was completed in 2011 for Portage Minerals
Inc. The estimate was prepared in accordance with Canadian N43 - 101 but has been treated as a foreign estimate as a competent person has not undertaken sufficient work to classify the estimates in accordance with the JORC Code 2012 and the
ASX listing rules and has not signed off on the estimate as a JORC Code mineral resource. It is uncertain whether following evaluation and further exploration work that the estimates will be able to be reported as mineral resources in accordance with
the JORC Code. The information in this presentation that relates to the Foreign Estimate in respect of the Mineral Claim is based on information compiled by Mr Ashley Jones, who is a member of the Australasian Institute of Mining and Metallurgy
(AusIMM) and qualifies as a ‘Competent Person’. Mr Jones is a director of Bryah Resources Limited. Mr Jones confirms that the information contained in this presentation about the Foreign Estimate is an accurate representation of the available data
and studies for the Mineral Claim.
DDH-07-04 Middle Zone intercept – 75.9g/t over 4.65m
Source: ASX announcement dated 21 May 2025 ‘Acquisition of Advanced High-Grade Gold Project’
ASX: BYH
The Vail Road deposit is sub-vertical, with high grade vein style
mineralisation commencing at surface.
Bryah’s mine development concept is for an underground mine
using decline and narrow-vein mining techniques.
Preliminary mine development planning work has commenced to
define the most effective approach and estimate.
An environmental characterisation study is underway to map out
the required environmental work programs.
Planning for stakeholder and rights holder engagement has
commenced.
A drill program planned to commence Q4 2025 will target infill and
extension of the Vail Road deposit and provides a low risk
opportunity to increase ounces.
Drilling will provide samples for processability test work.
GOLDEN PIKE
GOLD DEVELOPMENT PLAN
Source: ASX announcement dated 26 August 2025 ‘Golden Pike Gold and Antimony Project Update’
NEW BRUNSWICK
ASX: BYH
This map shows the antimony deposits and
significant occurrences in New Brunswick.
The Lake George Project (17) was North
America’s largest and longest producing
antimony mine for many years, operating from
1876 to 1996.
In addition to Bryah’s focus on the Golden Pike
Project, several other companies are also
focusing on antimony in New Brunswick: eg
our neighbours at the Bald Hill Antimony
Project (22)
New Brunswick stibnite ore is typically high
grade, with low contaminant levels.
THE RIGHT ADDRESS FOR ANTIMONY
Sources: Map - New Brunswick Energy and Resource Development, Antimony: Mineral Commodity Profile No. 12; ATMY 24/9/2025 ‘ATMY
Reports Commencement of Phase Two Drilling Program.
ASX: BYH
Antimony is a strategic and critical metal, used in multiple
industrial and defence applications such as solar panels,
batteries, flame resistant materials, precision optics and as an
alloying metal.
Chinese and Russian spheres dominate ~83% of global antimony
mining and supply, current global shortages due to export
controls by China and lack of supply of ores and concentrates.
Canadian project location allows for secure transit to European
and North American customers.
This represents a significant opportunity for the Province of New
Brunswick to develop not only a long term antimony mining
industry, but potentially the development of downstream
industries.
Governments, including the US Government, are actively
investing in and supporting critical mineral projects to shore up
supply security.
NEW BRUNSWICK
ANTIMONY OPPORTUNITY
ASX: BYH
GOLDEN PIKE
The Bond Road antimony prospect is located
approximately 1.1km to the south of the
Albright Brook prospect.
It has been described as an outcropping
antimony rich vein that has yielded
numerous boulder samples grading up to
57% Sb and 1.6 g/t Au.
Soil geochemical surveys have confirmed the
antimony prospectivity of the Bond Road
prospect.
Bryah recently conducted reconnaissance
mapping of Bond Road antimony area,
results from grab samples are pending.
Drill program targeting the antimony source
vein is planned to commence in Q4 2025
BOND ROAD ANTIMONY
Source: ASX announcement dated 7 October 2025 ‘Highest Grade Antimony Rock Chip Samples Retrieved to Date’
ASX: BYH
Bryah geologists have located the previously reported antimony mineralisation, recovering boulder grab
samples with assistance from local consulting geologist, Mr Roger Dahn, who was a key team member
for Rockport exploration campaigns and brings a depth of knowledge about the project.
Rock chip samples collected from boulders at the Bond Road prospect have yielded antimony values of:
- BBD02506 – 27.6% Sb and 1.61 g/t Au
- BBD02507 – 57.0% Sb
GOLDEN PIKE
BOND ROAD ANTIMONY
Source: ASX announcement dated 7 October 2025 ‘Highest Grade Antimony
Rock Chip Samples Retrieved to Date’
ASX: BYH
EXPLORATION UPSIDE
GOLDEN PIKE
Beyond the Vail Road Gold Deposit and Bond
Road Antimony Prospect there is high potential
throughout the 3,292ha claims group.
Geophysics highlights NW trending cross faults
between major regional NE trending thrust
faults (Taylor Brook Fault and Albright Fault).
Soil sampling and drilling has discovered high
grade gold and antimony mineralisation in
proximity to and the same orientation as the
NW structures.
Drill testing is required to test soil anomalies for
both gold and antimony across the Annidale Belt
portion of the claim.
Areas to the south and east of Vail Road have
strong soil anomaly signatures for gold
mineralisation.
Claim 7616 over regional geology map=>
BRYAH RESOURCES
ASX: BYH
Bryah is focused on developing the Golden Pike Project in a
way that provides positive benefits to the community, while
also minimising environmental impacts.
Upcoming activities for the project include:
Finalisation of drilling program plans.
Formal engagement of drilling contractor.
Drilling of priority gold and antimony targets.
Mineral Resource update under the JORC code (Australian
reporting standard – similar to NI 43-101).
Progressing development planning and approvals
processes for the Vail Road deposit.
Progressing stakeholder and rights holder engagement.
NEXT STEPS
bryah.au