Highest Grade Antimony Rock Chip Samples Retrieved to Date
Released
Released
Announcement PDF
Bryah Resources Limited
191B Carr Place
Leederville, WA 6007
Phone: +61 8 9321 0001
Email: info@bryah.au
ASX: BYH
ABN: 59 616 795 245
ASX ANNOUNCEMENT 7 OCTOBER 2025
Highest Grade Antimony Rock Chip Samples
Retrieved to Date
HIGHLIGHTS
• Rock chip samples collected from boulders at Bond Road Prospect yield antimony values of:
- BBD02506 – 27.6% Sb and 1.61 g/t Au
- BBD02507 – 57.0% Sb
• Rock chip samples collected from outcropping quartz veining at Vail Road Gold Deposit,1
including two samples returning significant gold results:
- BBD02501 – 1.47 g/t Au
- BBD02503 – 9.48 g/t Au
• The high-grade gold rock chip samples provide evidence of mineralisation from surface.
• These results have allowed Bryah to finalise plans to commence drilling in November 2025.
Bryah Resources Limited (“Bryah” or “the Company”) is pleased to provide the results of analysis of
boulder samples retrieved during the recent field reconnaissance visit to the Golden Pike Gold and
Antimony Project.2 Company CEO, Mr Greg Hill, Principal Geologist, Ms Gemma Lee and Canadian
Consultant Geologist, Mr Roger Dahn, visited the area of the Bond Road antimony prospect and
recovered rock chip grab samples. The samples were sent to an assay laboratory in Toronto for
analysis, after sample preparation at the Fredericton, New Brunswick facility of the same laboratory.
Results include the highest-grade antimony sample yet retrieved from the Bond Road antimony
occurrence, grading 57.0% Sb.
CEO, Greg Hill comments, “We are delighted that we were able to easily reach the Bond Road
antimony occurrence and recover stibnite rich rock samples from multiple locations. These high-grade
results for antimony at Bond Road confirm previous work and provide confidence for drill testing the
significant historical surface sample anomaly.”
Consultant geologist, Mr Dahn, has led many of the previous exploration programs on the Golden
Pike claims group and was instrumental in the discovery of antimony and gold mineralisation in drill
holes DPA-16-01 and DP-16-03, 1.1km to the north of Bond Road at the Albright Brook Prospect
during the Rockport Mining Corporation Limited (“Rockport”) 2016 program.3 Using his extensive
knowledge of the project area, Mr Dahn was able to guide the Bryah team to the Bond Road antimony
1
To improve clarity, the Company has renamed the Golden Pike Gold Deposit as the Vail Road Gold Deposit. All references
to the Vail Road Gold Deposit relate to the high-grade gold deposit that has an NI 43-101 declared foreign resource
estimate and includes the Main and Parallel zones (see ASX announcement dated 21 May 2025 ‘Acquisition of Advanced
High-Grade Gold Project’). The Vail Road Gold Deposit sits within the Golden Pike Project claims group 7616, which also
includes the Bond Road Prospect and the Albright Brook Prospect (see Figure 2).
2
See ASX announcement dated 22 September 2025 ‘Golden Pike Gold and Antimony Project Site Visit’
3
See ASX announcement dated 16 July 2025 ‘Due Diligence Highlights Antimony at Golden Pike’
ASX: BYH | bryah.au 2
prospect and recover stibnite rich boulders from multiple locations during the visit. Mr Dahn also
provided expertise in reconnaissance of existing drill collars and trenching, and undertook new rock
chip sampling at the Vail Road gold deposit.
A photo of Mr Dahn and Mr Hill with a stibnite-rich boulder at the Bond Road antimony prospect is
featured in Figure 1. Rock chip sample BBD02506 was retrieved from this location.
Figure 1 - Bryah's CEO Mr Greg Hill with geologist Mr Roger Dahn at the Bond Road Antimony Prospect
Bond Road Antimony Prospect
The Bond Road antimony prospect was discovered in 2008 during regional prospecting by Rockport
which found antimony-rich boulders at the area now known as the Bond Road Antimony Prospect.
An extensive soil sampling program was undertaken in the Bond Road area during 2013, with results
defining a zone of anomalous antimony 320m long on the northing direction and 150m wide on the
easting direction. This zone of anomalous antimony in soils includes values exceeding the upper
ASX: BYH | bryah.au 3
detection limit of the analysis method, being 500 ppm, with a coherent zone greater than 10ppm Sb.
Infill soils were collected during the field campaign of 2014 by Rockport, confirming and refining the
anomaly. Results for the soil surface sampling work conducted by Rockport personnel at the Bond
Road Prospect is provided in Appendix 1 of this announcement.
The recent trip to the Bond Road occurrence with Mr Dahn during September 2025 has pleasingly
returned two further antimony boulder sample locations, with the two samples collected bearing
stellar antimony grades of:
- BBD02506 – 27.6% Sb
- BBD02507 – 57.0% Sb
Sample BBD02506 also returned a significant gold grade of 1.61 g/t Au, indicating that the mineralised
system at Bond Road is prospective for both antimony and gold, as noted at the Albright Brook
prospect, 1.1km to the north.
Figure 2 – The Golden Pike Project showing prospect locations including Bond Road, Albright Brook and the
Vail Road Gold Deposit
The location of the Bond Road rock chip samples collected in September this year is shown on the
Golden Pike Project claims group in Figure 3, in addition to previous surface soil sampling work
collected between 2013 and 2014, indicating a strong drill target for antimony. The image presents
high quality LIDAR topographic data available from the Government of New Brunswick’s data
repository. During the site visit, roads in the area were scouted to determine the best access route
for transport of drilling equipment to the Bond Road antimony prospect.
ASX: BYH | bryah.au 4
Figure 3 - Historical Soil Sample Data with September 2025 Boulder Rock Chip Samples
Full sample details for the two Bond Road rock chip samples, including location, assay results and rock
descriptions are provided in Table 1.
Table 1 - Bond Road Rock Chip Sample Descriptions and Assays
East
NAD83 Z20
North
NAD83 Z20
RL Sample ID Rock Description
Sb
%
Au
g/t
As %
Cu
ppm
269414 5062026 140 BBD02506
Brecciated rock with angular chlorite-
sericite altered sedimentary rock with
massive stibnite matrix.
27.6 1.61 0.248 53.4
269403 5062061 141 BBD02507
Very strongly developed stibnite
mineralisation with approximately
massive stibnite and clasts of angular
quartz and chlorite-sericite altered
sedimentary rock. The archive
specimen retained has a large stibnite
crystal approximately 4cm long.
57.0 0.10 0.002 15.9
ASX: BYH | bryah.au 5
Figure 4 - Archive rock chip specimen from BBD02507 with a stibnite crystal approximately 4cm long (left)
and archive rock chip specimen from BBD02506 with brecciation texture (right)
Vail Road Gold Deposit
A key task for the site trip was to review the location and condition of historical drill collars and to
evaluate site access for planned drilling at the Vail Road Gold Deposit. Drill planning is in progress to
twin some historical holes and infill portions of the deposit to provide quality assurance in the dataset,
collect structural and density data, in addition to obtaining sufficient mass of sample for metallurgical
test work.
During the site visit, traverses through the deposit area were completed, with evidence found for
existing drill collars and trench sites. Scouting of the area of the main mineralised gold lodes found
additional vein outcrop along a 60m section of the Parallel Zone. Five rock chip samples were
collected from two sub-parallel quartz vein outcrops and sub-crops.
Three of the five samples collected at the Vail Road Gold Deposit returned gold values greater than
0.3 g/t Au, with a peak value of 9.48 g/t Au returned in sample BBD02503. Table 2 below outlines the
gold and copper assays for the five collected rock chip samples. Figure 5 is a map of the Vail Road
Gold Deposit, showing the location of rock chip samples BBD02501 – BBD02505, the projection of the
mineralised quartz veining to surface and the location of historical trenches. Surface rock chip
sampling conducted in 2006 is shown on the map, in addition to channel and rock chip sampling
completed during Rockport’s 2007 exploration campaign. The background to the figure is high quality
Vertical Derivative 1 aerial magnetics data, acquired by Globex Mining Enterprises Inc. (GMX-TSX,
GLBXF-OTCQX, G1MN-FSE) during the 2022 reporting period.
Cumulatively, the surface rock chip sampling at the Vail Road gold deposit to date demonstrates
gold mineralisation is present from surface, beneath a thin veneer (1 – 3m on average) of till unit
cover. Rock chip data for samples from surface outcrops and trenching are provided in Appendix 1
of this report.
ASX: BYH | bryah.au 6
Table 2 – Vail Road Gold Deposit Rock Chip Sample Descriptions and Assays
East
NAD83 Z20
North
NAD83 Z20
RL Sample ID Rock Description Au g/t
Cu
ppm
273345 5061320 164 BBD02501
Quartz veining boulder with grey
stylolites and mafic volcanic rock
contact along edge of vein. Malachite
Copper staining.
1.47 1,630
273349 5061305 164 BBD02502
Quartz block in sub-soil with bright
yellow stylolites. Lots of cleaner looking
(less mineralised) quartz than
BBD02501
0.01 130
273332 5061300 163 BBD02503
Quartz - mafic outcrop with abundant
grey stylolites in sampled quartz
veining.
9.48 595
273304 5061275 161 BBD02504
Quartz vein outcrop in gully,
underneath tree. Moderate number of
grey stylolites.
0.03 113
273312 5061280 163 BBD02505
Quartz vein in mafic outcrop; vein is
approximately 50cm wide.
0.43 141
Figure 5 – Vail Road Gold Deposit Plan View with 2025 Rock Chip Samples, Quartz Vein Interpretation and
Historical Rock Chip Sampling and Trenching
ASX: BYH | bryah.au 7
Next Steps
Following this first successful reconnaissance trip to the project site, Bryah is actively working
towards:
• Permitting approvals for clearing of drilling platforms and access tracks
• Engagement of key contractors and in-country staffing
• Execution of infill and twin drill holes at Vail Road Gold Deposit
• Initial exploration drilling program at Bond Road Antimony Prospect
For further information, please contact:
Greg Hill, CEO
+61 8 9321 0001
This announcement has been produced in accordance with the Company's published continuous
disclosure policy and has been approved by the Board.
ASX: BYH | bryah.au 8
ABOUT BRYAH RESOURCES
Bryah’s current projects are located in Canada and Western Australia, both Tier One global mining
and exploration jurisdictions.
Bryah has exercised its option to acquire the Golden Pike Gold and Antimony Project in southern New
Brunswick, Canada. The project covers approximately 3,292ha of contiguous mining claims which
includes the Vail Road high-grade gold deposit classified under NI 43-101,4 and the exploration-stage
Bond Road antimony prospect. The Golden Pike Project is located in an area that is close to road, rail,
port and grid power infrastructure. Southern New Brunswick is on the Canadian east coast, adjacent
to Maine, USA. It enjoys a mild maritime climate, allowing year round exploration activities. The
province has a mature mining services industry and has historically produced antimony and gold from
multiple mines.
The Company’s Bryah Basin licences cover 1,048km2 and hold potential for copper and gold. Bryah
also has a substantial $7M manganese joint venture on the licences with ASX listed OM Holdings
Limited (ASX: OMH), with OMH having already spent over $4.5 million to earn-in to the Manganese
Rights of the project.
Bryah holds a suite of mineral rights5 over the Gabanintha project, near Meekatharra, which has a
JORC 2012 Mineral Resource for Cu, Ni, Co and additional structural gold potential.
Bryah’s Lake Johnston tenements are prospective for battery metals lithium and nickel.
Bryah holds 4.02% of gold focused Star Minerals (ASX:SMS). Star Minerals has a Mineral Resource at
Tumblegum South Gold Project and exploration prospects in the West Bryah Basin.
COMPLIANCE STATEMENTS
The information in this announcement that relates to exploration results is based on information
compiled by Ms Gemma Lee, who is a Member of the Australian Institute of Geoscientists (AIG) and
is Principal Geologist for Bryah Resources Limited. Ms Lee has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity
which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Ms
Lee consents to the inclusion in this announcement of the matters based on her information in the
form and context in which it appears.
Where the Company refers to Exploration Results in this announcement (referencing previous
releases made to the ASX), the Company is not aware of any new information or data that
materially affects the information included in the relevant market announcements.
4
See ASX announcement 21 May 2025 ‘Acquisition of Advanced High-Grade Gold Project’
5
See ASX announcement 25 May 2022 ’36 Million Tonne Nickel-Copper-Cobalt Mineral Resource at Gabanintha’
ASX: BYH | bryah.au 9
FORWARD LOOKING STATEMENTS
This announcement may contain certain “forward-looking statements” which may not have been
based solely on historical facts, but rather may be based on the Company’s current expectations
about future events and results. Where the Company expresses or implies an expectation or belief as
to future events or results, such expectation or belief is expressed in good faith and believed to have
a reasonable basis. However, forward looking statements are subject to risks, uncertainties,
assumptions and other factors which could cause actual results to differ materially from future results
expressed, projected or implied by such forward-looking statements. Readers should not place undue
reliance on forward looking information. The Company does not undertake any obligation to release
publicly any revisions to any “forward looking statement” to reflect events or circumstances after the
date of this report, or to reflect the occurrence of unanticipated events, except as may be required
under applicable securities laws.
ASX: BYH | bryah.au 10
APPENDIX 1
PREVIOUS SOIL SAMPLING RESULTS – BOND ROAD ANTIMONY PROSPECT – 2013 and 2014
Co-ordinate System: NAD83 Zone 20 < 0.5 is below detection limit of 0.5 ppb Au, and < 5 is below detection limit of 5 ppb Au
Year North East
As
ppm
Sb
ppm
Au
ppb
Year North East
As
ppm
Sb
ppm
Au
ppb
2013 5061700 268450 17 0.86 < 0.5 2013 5062300 268950 24.2 1.31 < 0.5
2013 5061700 268475 6.8 0.38 < 0.5 2013 5062300 268975 17.3 0.59 < 0.5
2013 5061700 268500 30.1 1.16 < 0.5 2013 5062300 269000 16.1 0.6 < 0.5
2013 5061700 268525 12.9 0.43 < 0.5 2013 5062300 269025 32.2 0.58 < 0.5
2013 5061700 268550 24.3 0.38 < 0.5 2013 5062300 269050 42.3 0.97 < 0.5
2013 5061700 268625 16.5 0.7 12 2013 5062300 269075 77.5 1 < 0.5
2013 5061700 268650 17.8 0.66 73.9 2013 5062300 269100 108 3.74 < 0.5
2013 5061700 268675 14.6 0.5 < 0.5 2013 5062300 269125 203 4.74 < 0.5
2013 5061700 268700 16.4 0.43 < 0.5 2013 5062300 269150 366 1.89 < 0.5
2013 5061700 268725 15.1 0.64 1.5 2013 5062300 269175 1760 9.47 < 0.5
2013 5061700 268750 27 0.37 < 0.5 2013 5062300 269200 40.3 0.99 < 0.5
2013 5061700 268775 17.9 0.51 < 0.5 2013 5062300 269225 89.2 1.33 < 0.5
2013 5061700 268800 25.4 0.68 < 0.5 2013 5062300 269250 48.8 1 < 0.5
2013 5061700 268825 26.3 0.44 < 0.5 2013 5062300 269275 83 2.32 < 0.5
2013 5061700 268850 23.1 0.59 < 0.5 2013 5062300 269300 106 2.34 < 0.5
2013 5061700 268875 17 0.4 < 0.5 2013 5062300 269325 62.7 4.27 23.1
2013 5061700 268900 16.4 0.4 < 0.5 2013 5062300 269350 40.8 1.22 < 0.5
2013 5061700 268925 14.2 0.41 < 0.5 2013 5062300 269375 15.8 0.48 < 0.5
2013 5061700 268950 26 1.13 < 0.5 2013 5062300 269400 23.4 1.96 24.2
2013 5061700 268975 19.7 0.75 < 0.5 2013 5062300 269425 16.7 0.82 < 0.5
2013 5061700 269000 19.9 0.91 < 0.5 2013 5062300 269450 15.9 0.41 < 0.5
2013 5061700 269025 10.6 0.29 < 0.5 2013 5062300 269475 12.7 0.35 < 0.5
2013 5061700 269050 16.3 0.45 < 0.5 2013 5062300 269500 23.3 1.38 < 0.5
2013 5061700 269075 14.1 0.34 < 0.5 2013 5062300 269525 12.7 0.78 3.5
2013 5061700 269125 11.7 0.39 < 0.5 2013 5062300 269550 14.3 1.85 6.7
2013 5061700 269150 14.5 0.26 < 0.5 2013 5062300 269575 32 7.43 1.3
2013 5061700 269175 34.5 0.88 < 0.5 2013 5062300 269600 21.5 2.2 3.7
2013 5061700 269200 30.2 0.53 < 0.5 2013 5062300 269625 36.1 2.74 < 0.5
2013 5061800 268475 12.9 0.62 < 5 2013 5062300 269650 30.5 1.67 < 0.5
2013 5061800 268500 14.7 0.73 < 5 2013 5062300 269675 23.3 0.99 < 0.5
2013 5061800 268525 27.4 1.59 < 5 2013 5062300 269700 15.6 0.76 < 0.5
2013 5061800 268550 19.7 0.63 < 5 2013 5062400 268450 56.2 1.52 < 0.5
2013 5061800 268575 30.7 0.53 < 5 2013 5062400 268475 10.6 0.35 < 0.5
2013 5061800 268600 14 0.43 < 5 2013 5062400 268500 9.8 0.6 < 0.5
2013 5061800 268625 16.1 0.41 < 5 2013 5062400 268525 18.8 0.67 < 0.5
2013 5061800 268650 33.5 0.94 < 5 2013 5062400 268550 16.8 0.91 < 0.5
2013 5061800 268675 15.4 0.46 5 2013 5062400 268575 21.5 0.67 < 0.5
2013 5061800 268700 19.9 0.67 < 5 2013 5062400 268600 29.1 0.78 < 0.5
2013 5061800 268725 16.8 0.48 < 5 2013 5062400 268625 12 0.79 < 0.5
2013 5061800 268750 24.7 0.79 < 5 2013 5062400 268650 8.7 0.37 < 0.5
2013 5061800 268775 23.5 0.76 < 5 2013 5062400 268675 23.1 0.75 < 0.5
2013 5061800 268800 12.3 0.37 < 5 2013 5062400 268700 17.3 0.67 < 0.5
2013 5061800 268825 11.7 0.37 < 5 2013 5062400 268725 10.6 0.54 < 0.5
2013 5061800 268850 13.6 0.6 < 5 2013 5062400 268750 22.3 0.64 < 0.5
2013 5061800 268875 19.8 0.8 < 5 2013 5062400 268775 18.6 0.58 < 0.5
2013 5061800 268900 19.1 0.77 < 5 2013 5062400 268825 40.6 1.03 46.2
2013 5061800 268925 21.3 1.23 < 5 2013 5062400 268850 43.9 1.38 < 0.5
2013 5061800 268950 35.6 2.26 < 5 2013 5062400 268900 8.9 0.4 < 0.5
2013 5061800 268975 21.5 1.27 < 5 2013 5062400 268925 12.9 0.51 < 0.5
ASX: BYH | bryah.au 11
Year North East
As
ppm
Sb
ppm
Au
ppb
Year North East
As
ppm
Sb
ppm
Au
ppb
2013 5061800 269000 18.1 0.87 49 2013 5062400 268950 128 1.52 0.6
2013 5061800 269025 28.8 1.28 7 2013 5062400 269025 17.8 1.96 0.9
2013 5061800 269050 19.4 1.17 < 5 2013 5062400 269050 58.4 3.16 < 0.5
2013 5061800 269075 16.5 0.92 < 5 2013 5062400 269075 30.6 1.54 < 0.5
2013 5061800 269100 17.9 0.91 < 5 2013 5062400 269100 53.4 5.7 3
2013 5061800 269175 135 2.36 < 5 2013 5062400 269125 63.5 1 < 0.5
2013 5061800 269200 59.4 0.87 < 5 2013 5062400 269150 51.6 1.68 < 0.5
2013 5061800 269225 69 1.69 < 5 2013 5062400 269200 26.3 0.78 < 0.5
2013 5061800 269300 84.3 8.09 < 5 2013 5062400 269225 16 0.94 < 0.5
2013 5061800 269325 38.8 3.63 < 5 2013 5062400 269250 35.1 2.13 < 0.5
2013 5061800 269350 23.5 1.44 < 5 2013 5062400 269325 11.4 0.82 < 0.5
2013 5061800 269425 54.7 3.42 < 5 2013 5062400 269350 19.7 0.97 5
2013 5061800 269450 27.5 3.07 < 5 2013 5062400 269450 17.7 0.7 < 0.5
2013 5061800 269475 44.6 4.82 < 5 2013 5062400 269475 14.3 0.48 < 0.5
2013 5061800 269500 30.1 4.36 < 5 2013 5062400 269500 14.8 0.48 < 0.5
2013 5061800 269525 8 1.84 < 5 2013 5062400 269600 38.9 6.89 0.7
2013 5061800 269550 24.1 3.15 < 5 2013 5062400 269625 70.5 9.69 < 0.5
2013 5061800 269575 34.4 7.29 < 5 2013 5062400 269650 8.7 0.39 < 0.5
2013 5061800 269600 19.6 30.2 < 5 2013 5062400 269675 29 0.64 < 0.5
2013 5061800 269625 11.9 2.5 < 5 2013 5062400 269700 5 0.26 1.7
2013 5061800 269650 10.4 2.23 < 5 2013 5062500 268600 12.8 0.39 < 0.5
2013 5061800 269675 3 0.35 < 5 2013 5062500 268625 22.2 0.61 < 0.5
2013 5061900 268500 14.5 0.54 < 5 2013 5062500 268650 9.1 0.42 < 0.5
2013 5061900 268525 9.4 0.36 < 5 2013 5062500 268675 16.8 0.38 < 0.5
2013 5061900 268550 19.4 1.1 < 5 2013 5062500 268700 10.1 0.34 < 0.5
2013 5061900 268575 32.1 1.6 < 5 2013 5062500 268725 20.7 0.68 < 0.5
2013 5061900 268600 14.2 0.44 < 5 2013 5062500 268750 11.8 1.5 < 0.5
2013 5061900 268625 10.7 0.37 < 5 2013 5062500 268775 9.7 0.32 < 0.5
2013 5061900 268650 23.5 0.98 < 5 2013 5062500 268850 10.1 0.62 < 0.5
2013 5061900 268675 20.2 0.88 < 5 2013 5062500 268875 19.5 0.77 < 0.5
2013 5061900 268700 17 0.67 < 5 2013 5062500 268900 17 0.69 < 0.5
2013 5061900 268725 23.3 1.48 < 5 2013 5062500 268925 25.7 5.68 < 0.5
2013 5061900 268750 33.8 0.96 < 5 2013 5062500 268950 16.5 2.43 < 0.5
2013 5061900 268775 32.4 1.59 < 5 2013 5062500 268975 17.9 1.1 < 0.5
2013 5061900 268800 12.3 0.48 < 5 2013 5062500 269000 38.3 0.79 < 0.5
2013 5061900 268850 12.4 0.4 < 5 2013 5062500 269025 21.2 0.79 22.4
2013 5061900 268875 22 1.59 < 5 2013 5062500 269050 130 3.81 2.9
2013 5061900 268900 22.6 0.61 < 5 2013 5062500 269075 87.6 2.68 < 0.5
2013 5061900 268925 58.6 9.48 < 5 2013 5062500 269100 45.7 2.12 6.9
2013 5061900 268950 27.8 2.15 < 5 2013 5062500 269125 23.8 1.89 3
2013 5061900 268975 10.4 0.62 < 5 2013 5062500 269150 20.5 0.93 4.3
2013 5061900 269000 14 0.83 < 5 2013 5062500 269175 35 0.84 2.9
2013 5061900 269025 6.7 0.21 < 5 2013 5062500 269200 30.1 0.94 1.6
2013 5061900 269050 20.6 1.07 < 5 2013 5062500 269225 22.4 0.83 4.4
2013 5061900 269075 30.1 0.86 < 5 2013 5062500 269250 31.4 3.98 6.2
2013 5061900 269100 17 0.7 < 5 2013 5062500 269275 35.9 1.08 4
2013 5061900 269125 36 1.17 < 5 2013 5062500 269300 62.7 2.33 3.9
2013 5061900 269150 36.3 1.16 < 5 2013 5062500 269325 36 0.98 1.2
2013 5061900 269175 114 33.9 < 5 2013 5062500 269350 8.8 0.39 3.2
2013 5061900 269250 29.1 8.95 < 5 2013 5062500 269375 16.8 0.43 4.4
2013 5061900 269275 87.1 3.45 < 5 2013 5062500 269425 12.9 0.72 6.2
2013 5061900 269300 23.2 11 < 5 2013 5062500 269500 275 2.56 6.1
2013 5061900 269375 77.9 7.35 < 5 2013 5062500 269525 38.4 0.82 3.3
ASX: BYH | bryah.au 12
Year North East
As
ppm
Sb
ppm
Au
ppb
Year North East
As
ppm
Sb
ppm
Au
ppb
2013 5061900 269400 127 12.1 < 5 2013 5062500 269575 186 1.49 4.3
2013 5061900 269425 107 9.64 < 5 2013 5062500 269600 88.4 0.74 1.9
2013 5061900 269450 215 17.1 < 5 2013 5062500 269650 59.5 3.37 9
2013 5061900 269475 60.4 4.97 < 5 2013 5062500 269700 41.4 2.05 4.6
2013 5061900 269500 111 8.19 54 2013 5062600 268700 13 0.59 3.7
2013 5061900 269525 19.7 2.18 < 5 2013 5062600 268725 12.1 0.57 4.9
2013 5061900 269550 75.4 2.73 < 5 2013 5062600 268750 13.5 0.32 12
2013 5061900 269575 19.7 2.56 < 5 2013 5062600 268775 18.4 0.53 4.7
2013 5061900 269600 28.4 5.73 < 5 2013 5062600 268800 23 0.51 3.7
2013 5061900 269625 16.6 1.78 < 5 2013 5062600 268825 14.8 0.65 2.7
2013 5061900 269650 17.5 1.66 < 5 2013 5062600 268850 17 0.44 1.9
2013 5061900 269675 10.3 0.79 < 5 2013 5062600 268875 20.1 0.45 4.6
2013 5061900 269700 28.7 2.55 < 5 2013 5062600 268900 12.3 0.37 3.2
2013 5062000 268500 17 2.2 < 5 2013 5062600 268925 20.9 0.7 4.3
2013 5062000 268550 10.2 0.46 < 5 2013 5062600 268950 35.6 0.97 3.8
2013 5062000 268575 13 0.38 < 5 2013 5062600 268975 84.2 2.21 5.7
2013 5062000 268600 19.2 0.66 < 5 2013 5062600 269000 56.4 3.14 5.6
2013 5062000 268625 25.1 0.87 < 5 2013 5062600 269025 18.5 0.55 4.7
2013 5062000 268650 17.4 0.52 < 5 2013 5062600 269050 59.7 1.21 5.6
2013 5062000 268675 14.6 0.44 < 5 2013 5062600 269075 79 1.7 3.8
2013 5062000 268700 16.3 0.56 < 5 2013 5062600 269100 94.2 1.86 3.8
2013 5062000 268725 27.2 0.98 < 5 2013 5062600 269125 45.5 1.04 8.2
2013 5062000 268750 24 0.73 < 5 2013 5062600 269150 22.9 0.58 3.1
2013 5062000 268775 22.4 0.94 14 2013 5062600 269175 50.1 1.3 4.5
2013 5062000 268800 20.6 0.77 < 5 2013 5062600 269200 16.2 0.29 3
2013 5062000 268825 14.2 0.68 < 5 2013 5062600 269225 27.2 0.59 3.1
2013 5062000 268850 24.1 1.28 < 5 2013 5062600 269250 16 0.45 < 0.5
2013 5062000 268875 18.4 1.09 < 5 2013 5062600 269275 23.8 0.55 4.6
2013 5062000 268925 13.8 1.88 < 5 2013 5062600 269300 36.3 1.19 5.9
2013 5062000 268950 23.7 2.46 < 5 2013 5062600 269325 43.8 2.1 4.6
2013 5062000 268975 54.6 3.24 < 5 2013 5062600 269350 18.3 0.59 9.8
2013 5062000 269025 23.6 0.69 < 5 2013 5062600 269375 14 0.41 3.9
2013 5062000 269050 29.8 1.44 < 5 2013 5062600 269400 17 0.38 4.1
2013 5062000 269075 20 1.03 11 2013 5062600 269425 13.4 0.44 2.7
2013 5062000 269100 72 2.07 < 5 2013 5062600 269450 21.6 1.62 2.3
2013 5062000 269125 25.5 1.01 < 5 2013 5062600 269475 15.9 1.09 3
2013 5062000 269150 20.9 0.75 < 5 2013 5062600 269500 10.8 0.53 1.5
2013 5062000 269175 37.3 1.06 < 5 2013 5062600 269525 12.6 0.63 3.5
2013 5062000 269225 40.9 1.13 < 5 2013 5062600 269550 12.7 0.32 2.6
2013 5062000 269300 102 5.74 < 5 2013 5062600 269575 15.6 0.54 3.1
2013 5062000 269325 210 29.4 < 5 2013 5062600 269600 16.4 0.44 3.7
2013 5062000 269350 149 37.7 < 5 2013 5062600 269625 21.9 0.52 3.9
2013 5062000 269375 86.8 15 < 5 2013 5062600 269650 82.8 1.76 18.5
2013 5062000 269400 56.8 22.1 19 2013 5062600 269675 18.7 0.81 15.6
2013 5062000 269425 203 26.9 < 5 2013 5062600 269700 70 1.64 24.5
2013 5062000 269450 172 10.7 < 5 2013 5062700 268800 11.8 0.43 22.2
2013 5062000 269475 55.7 4.82 < 5 2013 5062700 268825 34.3 0.73 15.2
2013 5062000 269500 22.2 2.62 < 5 2013 5062700 268850 13.7 0.84 16.9
2013 5062000 269525 26.3 2.87 < 5 2013 5062700 268875 22.5 0.88 15.8
2013 5062000 269550 72.4 41.5 < 5 2013 5062700 268900 10.6 0.73 16.6
2013 5062000 269575 48.2 8.36 < 5 2013 5062700 268925 55.1 1.17 < 0.5
2013 5062000 269600 32.7 6.84 < 5 2013 5062700 268950 15 0.45 17.4
2013 5062000 269625 18.3 1.31 < 5 2013 5062700 268975 16.6 0.58 13.1
ASX: BYH | bryah.au 13
Year North East
As
ppm
Sb
ppm
Au
ppb
Year North East
As
ppm
Sb
ppm
Au
ppb
2013 5062000 269650 5.7 0.4 < 5 2013 5062700 269000 19 0.45 11.6
2013 5062000 269675 16.5 0.65 < 5 2013 5062700 269025 87.2 1.42 19.5
2013 5062000 269700 16.1 0.84 < 5 2013 5062700 269050 33.2 0.75 13.4
2013 5062100 268475 10 0.87 < 5 2013 5062700 269075 21.2 0.52 11.7
2013 5062100 268500 64.5 1.53 11 2013 5062700 269100 26.9 0.46 11.1
2013 5062100 268525 11.4 0.45 < 5 2013 5062700 269125 19.8 0.43 15.2
2013 5062100 268550 19.8 0.54 < 5 2013 5062700 269150 13.4 0.4 19.9
2013 5062100 268575 11.1 0.33 < 5 2013 5062700 269175 25.4 0.47 38.5
2013 5062100 268600 23.9 0.88 < 5 2013 5062700 269200 16.3 0.43 18
2013 5062100 268625 22.4 0.87 < 5 2013 5062700 269225 21.7 0.52 16.7
2013 5062100 268650 11.6 0.36 < 5 2013 5062700 269250 22.3 0.6 14.1
2013 5062100 268675 22.6 0.81 < 5 2013 5062700 269275 31.4 0.7 14.3
2013 5062100 268700 11 0.28 < 5 2013 5062700 269300 27.2 0.53 22.7
2013 5062100 268725 15.3 0.58 < 5 2013 5062700 269325 26.5 0.95 15.5
2013 5062100 268750 18 0.44 < 5 2013 5062700 269350 27.8 0.66 16.7
2013 5062100 268775 16.8 0.51 < 5 2013 5062700 269375 20.3 0.57 11.9
2013 5062100 268800 19.9 0.67 < 5 2013 5062700 269400 30.7 0.75 15.9
2013 5062100 268825 29.5 0.85 < 5 2013 5062700 269425 30.1 0.98 22.8
2013 5062100 268850 15.4 0.7 < 5 2013 5062700 269450 10.1 0.41 19
2013 5062100 268900 18.8 1.56 < 5 2013 5062700 269475 18.8 0.69 15.5
2013 5062100 268925 83 2.9 < 5 2013 5062700 269500 14.2 0.58 11.3
2013 5062100 268950 15.2 0.46 < 5 2013 5062700 269525 15.4 0.45 14
2013 5062100 268975 45.9 2.08 < 5 2013 5062700 269550 35.2 1.13 15.3
2013 5062100 269000 65.7 5.49 < 5 2013 5062700 269575 12.6 0.48 12.1
2013 5062100 269025 40.9 0.64 < 5 2013 5062700 269600 7.9 0.29 18.9
2013 5062100 269075 49.8 1.7 < 5 2013 5062700 269625 129 1.56 5.9
2013 5062100 269100 28.7 0.85 < 5 2013 5062700 269650 9 0.31 17.3
2013 5062100 269125 38.8 1.71 < 5 2013 5062700 269675 41.4 1.05 17.4
2013 5062100 269150 16.7 0.58 < 5 2013 5062700 269700 44.9 0.95 13.6
2013 5062100 269175 40.5 0.85 < 5 2014 5061951 269194 49.2 2.32 < 0.5
2013 5062100 269200 155 2.64 < 5 2014 5061951 269224 52.2 4.1 < 0.5
2013 5062100 269325 104 27.7 < 5 2014 5061940 269248 4.8 13.1 < 0.5
2013 5062100 269350 119 33.5 < 5 2014 5061943 269267 26.6 5.63 < 0.5
2013 5062100 269375 90.7 42.2 < 5 2014 5061945 269301 17.1 5.96 < 0.5
2013 5062100 269400 304 119 < 5 2014 5061937 269322 93.1 11.6 < 0.5
2013 5062100 269425 71.6 17.9 < 5 2014 5061943 269348 136 15 < 0.5
2013 5062100 269450 36.3 2.31 < 5 2014 5061945 269377 208 30 4.2
2013 5062100 269475 20.2 2.97 < 5 2014 5061938 269401 157 29.7 4
2013 5062100 269500 9.8 0.64 < 5 2014 5061946 269415 326 49.5 3.5
2013 5062100 269525 11.9 0.76 25 2014 5061945 269442 41.1 5.14 < 0.5
2013 5062100 269550 6.2 0.36 < 5 2014 5061945 269471 27.2 2.53 < 0.5
2013 5062100 269575 14 1.39 < 5 2014 5061945 269494 63.9 5.38 < 0.5
2013 5062100 269650 13.8 0.64 < 5 2014 5061946 269519 17.6 2.05 < 0.5
2013 5062100 269675 20.4 1.08 < 5 2014 5061944 269545 41.8 5.45 1.3
2013 5062100 269700 35.3 1.45 < 5 2014 5061944 269565 39.9 10 < 0.5
2013 5062200 268375 7.5 0.31 < 0.5 2014 5061936 269596 24.7 6.35 < 0.5
2013 5062200 268400 26.7 1.9 < 0.5 2014 5061944 269618 23.3 5.46 < 0.5
2013 5062200 268425 14.5 3.05 < 0.5 2014 5061939 269640 12 1.7 < 0.5
2013 5062200 268450 26.1 1.25 < 0.5 2014 5061945 269665 7.6 0.63 < 0.5
2013 5062200 268475 21.1 0.63 < 0.5 2014 5061943 269690 8.2 1.32 < 0.5
2013 5062200 268500 28.5 0.51 < 0.5 2014 5062040 269218 34 1.77 < 0.5
2013 5062200 268525 14.8 0.26 < 0.5 2014 5062041 269245 12.3 1.43 < 0.5
2013 5062200 268550 10.5 0.22 < 0.5 2014 5062037 269271 24 5.1 < 0.5
ASX: BYH | bryah.au 14
Year North East
As
ppm
Sb
ppm
Au
ppb
Year North East
As
ppm
Sb
ppm
Au
ppb
2013 5062200 268575 13.6 0.75 < 0.5 2014 5062039 269292 91.8 6.15 < 0.5
2013 5062200 268600 15.3 0.37 < 0.5 2014 5062036 269321 129 22.6 < 0.5
2013 5062200 268625 11.1 0.4 < 0.5 2014 5062033 269347 143 56.1 < 0.5
2013 5062200 268650 7.4 0.17 < 0.5 2014 5062028 269373 245 21.3 < 0.5
2013 5062200 268675 23.6 0.55 4.9 2014 5062025 269399 63.2 43.4 3.7
2013 5062200 268700 19 0.15 < 0.5 2014 5062023 269429 24.2 4 < 0.5
2013 5062200 268725 18 0.25 < 0.5 2014 5062020 269453 68.6 5.91 < 0.5
2013 5062200 268750 20.4 0.63 < 0.5 2014 5062018 269480 26.3 3.15 < 0.5
2013 5062200 268775 19.7 0.38 < 0.5 2014 5062017 269507 18.3 3.58 < 0.5
2013 5062200 268800 14.2 0.31 < 0.5 2014 5062015 269533 28.8 3.04 < 0.5
2013 5062200 268825 19.5 0.38 < 0.5 2014 5062016 269558 115 20.7 < 0.5
2013 5062200 268850 33.3 0.36 < 0.5 2014 5062016 269585 58.4 27.1 < 0.5
2013 5062200 268875 30.1 0.56 < 0.5 2014 5062013 269609 30
Share your feedback
Discover