Annual Report to shareholders
Released
Released
Announcement PDF
ACN: 616 795 245
ANNUAL REPORT
30 JUNE 2024
2024 Annual Report
CONTENTS
Corporate Directory
1
Letter from the Chairman
2
Directors’ Report
3
Consolidated Statement of Profit or Loss and Other Comprehensive Income
36
Consolidated Statement of Financial Position
37
Consolidated Statement of Changes in Equity
38
Consolidated Statement of Cash Flows
39
Notes to the Financial Statements
40
Directors' Declaration
66
Auditor’s Independence Declaration
67
Independent Auditors’ Report
68
Annual Mineral Resource Statement
71
Additional ASX Information
76
2024 Annual Report
Corporate Directory
Directors
Ian Stuart
Leslie Ingraham
Brian Davis
Non-executive Chair
Non-executive Director
Non-executive Director
Chief Executive Officer
Ashley Jones
Company Secretary
Neville Bassett
Registered Office & Principal Place of Business
191B Carr Place
Leederville WA 6007
Telephone: 08 9321 0001
Share Registry
Automic Pty Ltd
Level 5, 191 St Georges Terrace,
Perth WA 6000
Telephone: 1300 288 664
Auditors
Elderton Audit Pty Ltd
Level 32, 152 St Georges Terrace,
Perth WA 6000
Solicitors
Steinepreis Paganin
Level 4, The Read Building,
16 Milligan Street,
Perth WA 6000
Securities Exchange Listing
Bryah Resources Limited shares (BYH) and options (BYHOA) are quoted on the Australian Securities
Exchange (ASX).
1|P a g e
2024 Annual Report
Letter from the Chair
On behalf of your Board of Directors, I have pleasure in presenting the Annual Report and Financial
Statements of Bryah Resources Limited for the year to 30 June 2024.
Since the last Annual Report, Bryah has upgraded its Manganese JORC compliant mineral resource estimate
to over 3 million tonnes at 20.1% and completed further drilling on the Manganese project which was
reported in November 2023. We completed a large soil sampling program and completed over 3000m of
drilling and testing a large lithium soil anomaly in the Lake Johnston area.
Bryah’s portfolio is dominated by the battery metals, lithium, manganese, copper and nickel. Evolving
political policy, electrification of the transportations sector and a global push to decarbonise the economy
means a very positive outlook for these metals which is expected to push demand to record levels.
In 2023/24 the Company pivoted to lithium when tenements that were sold pending an IPO were returned
to Bryah. Soil sampling results quickly found a large lithium anomaly and it was drill tested with 3487 m of
RC drilling. It confirmed the potential of the tenure at Lake Johnston to host further lithium discoveries.
The Bryah Manganese Joint Venture is with OM (Manganese) Limited, a wholly owned subsidiary of ASXlisted OM Holdings Limited, a vertically integrated manganese company. OM (Manganese) Limited is funding
exploration activities earning 51% JV interest in the Joint Venture (JV). The resource mineral estimate was
upgraded from 1.8 million tonnes at 21% Mn to 3.07 million tonnes at 20.2% Mn.
Additionally, and as at 30 June 2024 Bryah holds 12.98% in ASX-listed Star Minerals and further performance
rights on success conditions, keeps exposure to the project’s success and the gold price.
The Board of Bryah Resources Limited remains committed to developing a successful well-funded,
exploration business with a focus on copper, manganese, and other critical energy metals. I again thank
management, our employees and consultants for their achievements this year and the ongoing support of
our growing number of shareholders. We look forward to another very active year on our Projects in 2024/25.
Yours faithfully,
Ian Stuart
Non-executive Chair
2|P a g e
2024 Annual Report
Directors’ Report
Your directors present their report on Bryah Resources Limited (“Bryah” or the “Company”) and its subsidiary
(the “Consolidated Entity” or “Group”) for the year ended 30 June 2024.
Corporate Highlights
Corporate
As at 30 June 2024, the Company had 435,453,523 ordinary shares on issue. 94,531,681 Listed options
exercisable at $0.035 expiring 1 December 2025 and 2,000,000 unlisted options exercisable at $0.054
expiring 12 August 2025.
Bryah completed one placement for the financial year, in November 2023 where Bryah completed the
placement of 71,985,299 new fully paid ordinary shares (“Shares”) at an issue price of $0.017 per Shares
raising $1.224 million (before costs), as announced on 21 November 2023. The Placement included free
attaching two (2) for three (3) listed options, with an exercise price of $0.035, expiring 1 December 2025
("Listed Option").
Subsequent to the financial year end, the company completed a placement and issued 67,833,333 shares at
$0.006 per share on, 2 July 2024. The Placement includes a free attaching one (1) for three (3) unlisted option,
with an exercise price of $0.012, expiring 2 July 2027 1.
Bryah Basin – Manganese Joint Venture
Two mining licence applications granted over Bryah Basin Manganese Joint Venture. Mining licence granted
over current JORC resources at Brumby Creek and Black Hill prospects. Resource model updated in August
2023 increasing to 3.07 MT at 20.1% Mn 2. Mineral Resources estimated at Area 74, Redrum, Brumby Creek,
Black Hill and Horseshoe areas - 5 prospects in total. Indicated Resource increased by 91% and Inferred
Resource increased by 32%. All the Mineral Resources are now included on granted mining licences. Drilling
completed for 98 collars for 2,938 metres at Brumby Creek West, Epona, Redrum, Blackhill North and Gold
Trip prospects.
Brumby Creek West drill hole intercepts:
13m at 22.7% Mn in hole BBRC241 from 15m
6m at 24.4% Mn in hole BBRC249 from 19m
4m at 22.0% Mn in hole BBRC251 from 28m
Redrum drill hole intercepts:
7m at 29.3% Mn in hole RRRC074 from 21m
8m at 29.6% Mn in hole RRRC076 from 14m
5m at 21.0% Mn in hole RRRC072 from 11m
1 ASX announcement BYH 2nd July 2024
2
ASX: BYH announcement dated 24th August 2023.
3|P a g e
2024 Annual Report
7m at 20.7% Mn in hole RRRC072 from 20m
Black Hill North drill hole intercepts:
3m at 34.8% Mn in hole BHRC035 from 0m
Epona drill hole intercepts:
5m at 21.0% Mn in hole EPRC015 from 15m
3m at 21.5% Mn in hole EPRC028 from 10m
Gold Trip drill hole intercepts:
2m at 25.5% Mn in hole GTRC005 from 3m.
Bryah Basin – Copper-Gold Project (100%)
Prospective copper and gold prospects are under review. Geophysical surveys now targeting mineralisation.
Continued field reconnaissance.
Windalah
Follow-up RC and diamond drilling results completed in late 2022. Results included 717m (including
1,216m RC pre-collars) diamond drilling tails.
•
•
•
•
Best results included:
2m @ 3.88 g/t Au from 437m in BBRD072
1m @ 0.35% Cu from 429m in BBRD072
Targeting Cu-Au VMS mineralisation at 300m and 500m depth.
Deep VMS targets are a product of multiple lines of strong geological evidence.
Downhole electromagnetic surveys (DHEM) to tests for off-hole conductors commenced in
September and completed in October 2023. Results under review.
Olympus
•
•
•
•
First pass drilling at Olympus (total of 2,148m of RC drilling completed in June/July 2022) identified a
prospective mineralised horizon.
Identified semi massive sulphide mineralisation and anomalous copper up to 0.1% Cu.
Review of highly anomalous Volcanogenic Hosted Massive Sulphide (VHMS) pathfinder elements.
Two Dipole – Dipole Induced Polarisation lines were completed across the Olympus geochemical
anomaly.
Aquarius Trend
•
Multiple early-stage geochemical anomalies identified.
4|P a g e
2024 Annual Report
West Bryah Targets (100%)
Desktop review shows rare earth element and uranium potential. Yarlarweelor complex and the Despair
Granite is Archean I type granite with mapped pegmatites historically reported. Uranium intersection of 35m
at 503ppm 3 U3O8 less than 200m from the tenement boundary. Anomalous Lanthanum values in statewide
dataset.
Gabanintha – Base Metals
Australian Vanadium Limited (AVL) executed a $49 million grant agreement under the Federal Government
Modern Manufacturing Initiative – Manufacturing Collaboration Stream to support the Australian Vanadium
Project. Bryah Resources signed as a collaboration participant and retains the nickel and copper rights. The
collaboration between AVL and Bryah is focused on realising the significant strategic value of the Ni, Co and
Cu within the non-magnetic tailings fraction at the Australian Vanadium Project. The target base metals are
contained in the Indicated portion of the Mineral Resource, 16.1 Mt @ 762 ppm Nickel, 212 ppm Copper and
231 ppm Cobalt, included in the high-grade vanadium zone within the planned open pits of AVL’s vanadium
project as described in its Bankable Feasibility Study. The collaborative project includes recovery of nickel,
copper and cobalt from the tails stream.
Copper mineralisation intersected at Copper Hills South prospect in 5 historical drill holes. Best intersection
reported in 2013 4 was:
GRC1152 – 18m (7-25m) @ 0.42% Cu, including 2m (20-22m) @ 2.19% Cu.
Copper mineralisation in GRC1152 is open in all directions.
Lake Johnston Lithium Nickel Project (100%)
An Option agreement with Mining Green Metals (MGM) to acquire a 70% interest in the Lake Johnston
Lithium-Nickel project did not proceed. In July 2023, MGM advised that they are not exercising the option on
the tenements due to the IPO condition not being met. Bryah subsequently started exploring the area.
Lithium soil anomaly up to 3km long and 1km wide defined in soil orientation lines at Pegasus 5. Infill soil
results then confirmed an anomaly at Pegasus 6. Drilling approved and commenced at Pegasus prospect 7.
Mineral Resources (MinRes) proposed a regional lithium processing facility with the purchase of Poseidon’s
Nickel’s Black Swan plant at Lake Johnston which has since been withdrawn. Testing of the main eastern
anomaly and a couple of the smaller western ones commenced. The latest soils program has delineated drill
targets at Roundtop, Westlake and the Sphinx prospects, which are still under interpretation.
Pegasus
Drilling was commenced at Pegasus in May 2024 with collars across the prospect, following promising
soil sample assays.
3
ASX Announcement 10 November 2022. West Bryah review shows potential for Uranium and REEs
ASX: YRR ASX announcement dated 27 November 2013 for full details.
5
ASX: BYH announcement 22nd January 2024. First Drill Targets Defined by Soil Anomalies.
6
ASX: BYH announcement 21st March 2024. Exploration Update.
7
ASX: BYH announcement 29th April 2024. Drilling Started at the Pegasus Lithium Prospect Lake Johnston.
4
5|P a g e
2024 Annual Report
Review of Operations
Bryah holds a quality exploration portfolio in three highly prospective locations in Western Australia (Figure
1). Two projects have production potential with JORC compliant mineral resource estimates defined. Bryah
have defined JORC resources estimates of manganese in the Bryah Basin, and Nickel and Copper in the
Gabanintha area, south of Meekatharra.
Figure 1: Project Location Map
6|P a g e
2024 Annual Report
Bryah Basin Copper-Gold Project (BYH – 100%)
The Bryah Basin project covers approximately 1,048km2 in central Western Australia. The project is located
close to several mining operations including the high-grade Volcanogenic Massive Sulphide (VMS) DeGrussa
copper-gold mine operated by Sandfire Resources NL (ASX: SFR) until May 2023 and the Fortnum gold mine
operated by Westgold Resources Limited (ASX: WGX) (Figure 2).
During the period, the Company has made considerable progress in refining a VMS target at Windalah and
has expanded what it has learnt to other nearby areas that display similar geochemical anomalies. Previous
diamond drilling intersected massive pyrite zones and then large intersections of pyrite stringers, these
included two deep holes totalling 1,261m, targeting the 300m and 500m vertical depth. The sulphide style
was interpreted as VMS style mineralisation.
Bryah’s tenements cover large areas of under-explored ground adjacent to the copper-gold deposit at
Horseshoe Lights, which is hosted in similar aged volcanic and sedimentary rocks to the DeGrussa coppergold mine. The Bryah Basin also has several historical and current manganese mines including the Company’s
Horseshoe South Manganese Mine.
7|P a g e
2024 Annual Report
Figure 2: Bryah Basin Project Location Plan
The tenements are underlain by the Padbury and Bryah Group, consisting of the Labouchere formation and
Horseshoe formation respectively, of which are known to host copper and gold deposits in the Bryah Basin
and the greater district. Review of the expansive datasets previously captured by Bryah Resources have been
completed and are highlighting new targets.
Windalah
VMS systems in the Bryah Basin are known to host high-grade copper-gold deposits such as Sandfire’s
DeGrussa and Monty mines and the historical Horseshoe Lights mine, located 13 kilometres to the north of
Bryah’s Windalah Prospect. The exploration target at Windalah occupies the same stratigraphic position as
the Horseshoe Lights deposit.
The current geological model and targeting hypothesis remain constant. A massive, laminated sulphide
horizon is thought to occur along the intersection of a footwall stringer zone and the ‘ore stratigraphic
horizon’ – the equivalent stratigraphic position of the nearby Horseshoe Lights Cu-Au mine. The Company
believes that following structural, geological, geochemical and hyperspectral vectors will lead to the
discovery of Cu sulphides at greater depth than current drilling.
Olympus
The Olympus prospect has similar elemental anomalism to Windalah and relative values indicate it may be
closer to the ‘hotter’ parts of the VMS targets.
Olympus lies on the Northern limb of the Mars Dome, which forms part of a series of double-plunging
anticlinal dome structures in the northern Bryah Basin. This is termed the Aquarius trend and consists also of
the Saturn and Jupiter Domes to the north-west. These dome structures connect laterally with outcropping
Narracoota Formation to the northeast through a series of possible covered dome and basin structures.
Reverse Circulation (RC) drilling at Olympus has so far identified a downhole pathfinder anomalous zone with
copper-gold potential in the stratigraphic footwall. Drilling has identified numerous lithofacies, textures,
mineralogy, alterations, and styles of mineralisation that are typical of high sulphidation VMS deposits such
as the nearby Horseshoe Lights Cu-Au mine.
Downhole Electromagnetic and Dipole-Dipole Induced Polarisation Surveys
Downhole electromagnetic (DHEM) surveying, consisting of down hole surveys at Windalah 8, started in
September and was completed in October 2023. The DHEM was proposed for ‘full length’ down hole
surveys of BBRD072 and BBRD076 (including RC pre-collar and diamond tail). The DHEM surveys were
undertaken to investigate the potential for near miss mineralisation.
Two Dipole – Dipole Induced Polarisation lines were completed across the Olympus geochemical anomaly.
Results found that the Windalah DHEM survey, and the Dipole – Dipole Induced Polarisation lines across
Olympus did not delineate an electrical conductor.
8
ASX: BYH announcement dated 19th May 2023 Windalah Copper-Gold Prospect Diamond Drilling Results
8|P a g e
2024 Annual Report
Reviews of the expansive datasets previously captured by Bryah Resources have been complete and continue
to undertake attempts to gain additional insights and develop new targets. While these reviews are still on
going, there are several initial promising targets that intend to be investigated in the coming field season.
West Bryah Targets (BYH - 100%)
The West Bryah Project is located approximately 140km north, northwest of Meekatharra. The Project is
situated within the Peak Hill District. Several current and historical mine-sites are within close proximately to
West Bryah tenure, including Westgold’s Fortnum Project (including Starlight and Yarlarweelor), Auris
Mineral’s Forrest-Wodger Cu-Au prospects, Labouchere and the historic Wilthorpe gold mine. The geology
identifies Yarlarweelor complex, and the Despair Granite is Archean I type granite with mapped pegmatites
historically reported, with desktop reviews showing rare earth element and uranium potential.
Uranium intersection of 35m at 503ppm U3O8, was recorded less than 200m from tenement boundaries,
together with anomalous Lanthanum values available in a statewide dataset.
Bryah Basin Manganese Joint Venture (BYH - 49% JV Interest)
Bryah has been monitoring the Manganese price and completing a review of the metallurgical data following
the grant of the mining licences over all resources in 2023. The price of manganese has increased significantly
following a supply shortage exacerbated by the South 32 Groot Eylandt’s manganese operation inability to
export due to infrastructure damage sustained during Tropical Cyclone Megan in March this year. Groot
Eylandt’s manganese mine is not expected to recommence wharf operations and export operations until Q3
2025.
In April 2019, Bryah executed a Manganese Farm-In and Joint Venture Agreement (“JV Agreement”) with
OMM, a wholly owned subsidiary of ASX-listed OM Holdings Limited (ASX: OMH). The JV Agreement applies
to the rights to manganese only over approximately 600 km2 of the entire tenement package held by the
Company in the Bryah Basin. The Manganese JV includes the Horseshoe South Manganese Mine, which is the
largest historical manganese mine in the region.
During Q1, two mining licences were applied for and subsequently granted 9. The manganese resource was
updated, and a RC drilling program was completed.
All the Mineral Resources are now included on granted mining leases.
Mineral Resource includes 0.65 Mt at 20.0% Mn on granted Mining Lease M52/806
Mineral Resource includes 2.42 Mt at 20.2% Mn on granted Mining Leases M52/1087 and M52/1088
Over 67 % of the resources are in the Indicated Mineral Resource category.
Indicated Mineral Resources of 2.07Mt at 20.9% Mn and Inferred Mineral Resources of 0.99Mt at
18.6% Mn.
9
ASX: BYH announcement dated 30th September 2023 Quarterly Activities Report
9|P a g e
2024 Annual Report
M52/ 1087
M52/ 1088
Winthorpe (Au)
Figure 3 Mining Lease M52/ 1087 and M52/ 1088 within tenement holding.
During the period, results for the August 2023 reverse circulation (RC) drilling program, covering 95 collars
for 2,938 meters, were reported10. The results covered prospects Brumby Creek West, Epona, Redrum, Black
Hill North and Gold Trip. The best intersections continued to come from the extensional drilling around the
resources at Brumby Creek and Redrum. Drilling results continue to identify extension of manganese
mineralisation.
10
ASX: BYH announcement BYH 16th November 2023 Manganese Drilling Results Continue to Impress
10 | P a g e
2024 Annual Report
Figure 4 Mn prospect locations with geology showing the targeted Horseshoe Formation.
Brumby Creek West prospect
Drilling results continued to show shallow manganese mineralisation extending southwards. The
mineralisation appeared to be bifurcating with excellent results on the western side becoming prominent.
Manganese grade was significant, with the best results of:
6m at 24.4% Mn from 19m in hole BBRC0249
13m at 22.7% Mn from 15m in hole BBRC0241
4m at 22.05% Mn from 28m in hole BBRC0251
11 | P a g e
2024 Annual Report
Figure 56 Collar Plan of August 2023 Manganese Drilling at Brumby Creek West (Red collars).
12 | P a g e
2024 Annual Report
Figure 7 Oblique Section Brumby Creek West prospect.
Redrum prospect
Following the mineralisation to the northeast, drilling has continued to give excellent results, whereas results
to the south have closed out the mineralisation. The best northern Redrum results are:
7m at 29.3% Mn from 21m in hole RRRC074
8m at 29.6% Mn from 14m in hole RRRC076
5m at 21.0% Mn from 11m in hole RRRC072
7m at 20.7% Mn from 20m in hole RRRC072
3m at 21.2% Mn from 30m in hole RRRC072
4m at 23.8% Mn from 12m in hole RRRC084
The resource at Redrum is 780,000 tonnes - 429Kt at 19.2% Mn Indicated Resource and 351Kt at 18.0% Mn
Inferred Resource (Table 1). These further results extend the mineralisation to the north, where drilling
mostly closed out the southern extent.
13 | P a g e
2024 Annual Report
Figure 8 Collar Plan of the August 2023 Manganese Drilling at Red Rum (Red collars).
Previously reported:
RRRC059
8m at 17.5% Mn
Previously reported:
RRRC032
4m @24.7 % Mn
Previously reported:
RRRC031
5m @23 % Mn
Previously reported:
RRRC030
15m @24.8 % Mn
Previously reported:
RRRC029
5m @19.3 % Mn
Previously reported:
RRRC058
2m @18 % Mn
3m @ 19.7% Mn
7m at 21.4% Mn
Figure 9 Oblique Section Redrum Prospect (previous results included1F 11 2F 12).
11 ASX announcement 31st August 2022 Continued Manganese Drilling Success-Redrum and Brumby West
12 ASX announcement 10th May 2023 Drilling at Redrum Increases Resource Potential
14 | P a g e
2024 Annual Report
Manganese Resource
In 2023, the Inferred and Indicated Bryah Basin Manganese Mineral Resource increased to 3.07 Million
Tonnes (Mt) at 20.2% Mn 13
Table 1 August 2023 Manganese Mineral Resource at 15% Mn Cut-off
2023 Estimate
Prospect
kt
Mn %
Fe %
Area 74
286
24.1
21.1
Brumby Creek
1,038
20.6
20.5
295
20.5
23.6
Redrum
429
19.2
22.7
Black Hill
24
29.7
20.2
2,072
20.9
21.5
16
18.0
23.5
276
18.5
24.4
351
19.5
29.9
351
18.0
23.8
Total Inferred
994
18.6
26.1
Total Mineral Resource
3,066
20.2
23.0
Horseshoe
Category
Indicated
Total Indicated
Area 74
Brumby Creek
Horseshoe
Inferred
Redrum
Note: Appropriate rounding applied. kt = 1,000 tonnes
Since the 2022 Maiden Mineral Resource Estimate, extensional drilling at the Brumby West, Redrum and
Area 74 deposits has contributed significant additional tonnage to the total Mn Mineral Resource. Better
understanding of the geology and mineralisation of deposits in the Brumby Creek, Area 74 and Redrum areas
has led to minor reviews and modifications to the wireframes previously used in the 2022 MRE. This is a
result of additional drilling and surface geological mapping.
The Bryah Basin hosts several historical manganese mining areas. The Horseshoe Range has been the main
manganese producing region within the Bryah and Padbury Basins with production dominated by the
Horseshoe South Mine and a satellite deposit at Horseshoe North.
Reported production from these deposits from 1948 to 1971, was 490,000 tonnes of manganese ore at an
average grade of 42% manganese 14. Mining between 2008 and 2011 produced over 400,000 tonnes of
manganese ore from the reprocessing of historical stockpiles and open pit mining at Horseshoe South.
13
14
ASX: BYH announcement 24th August 2023
Pirajno, F., Occhipinti, S. A., and Swager, C. P., 2000, Geology and mineralization of the Palaeoproterozoic Bryah and Padbury
Basins, Western Australia: Western Australia Geological Survey, Report 59, 52p.
15 | P a g e
2024 Annual Report
Gabanintha Gold and Base Metals Project (100% BYH)
On 30 May 2023, AVL finalised a $49M grant for its Australian Vanadium Project. Part of the grant involves
collaboration on realising the significant strategic value of the Ni, Co and Cu within the mine tailings at the
Project. Previous metallurgical test work has shown a floatation circuit can make a sulphide concentrate of
up to 6.3% base metals copper, cobalt and nickel 15. Importantly, throughout the BFS, AVL has provisioned
space in the plant design for the floatation circuit. Bryah benefits from the portion of the grant to finalise
studies, and benefits from the whole grant as it moves AVL closer to developing the Australian Vanadium
Project.
The Gabanintha Project covers ~80km2 approximately 40km south of Meekatharra in Western Australia.
Bryah holds the rights to all minerals except Vanadium, Uranium, Cobalt, Chromium, Titanium, Lithium,
Tantalum, Manganese & Iron Ore (“Excluded Minerals”), which are retained by Australian Vanadium Limited
(ASX: AVL).
Australian Vanadium (ASX:AVL) completed a Bankable Feasibility Study in December 2021 on their Australian
Vanadium Project, where Bryah updated the Cu, Ni and Co resource based on the pit designs in May 2022.
JORC Resource Cu Ni
An Indicated and Inferred Base Metal Mineral Resource for the Project has been reported within the highgrade vanadium domain, beneath the base of sulphide weathering, in the areas of highest drill density (80 –
140 metre spaced drill lines with 30 metre drill centres). Base metals are potentially economically recoverable
as a sulphide flotation of the tails produced through beneficiation of the vanadium ore. Due to the reliance
on concentration of the base metals into the non-magnetic tails through beneficiation of the vanadium ore,
the Indicated Mineral Resource is restricted to the high-grade domain within the pit optimisations from AVL’s
Bankable Feasibility study (BFS). Inferred Mineral Resource is located beneath the optimised pits in the
vanadium high-grade domain within classified vanadium Mineral Resources. Table 2 below outlines the
resource by pit area.
15 ASX: BYH announcement dated 1st June 2021 ’31.3 Million Tonne Nickel-Copper-Cobalt Mineral Resource at Gabanintha’.
16 | P a g e
2024 Annual Report
Table 2: May 2022 Base Metals Mineral Resource Inventory at the Australian Vanadium Project 16
2022 Base Metals
Resource Area
Classification
Million Tonnes
(Mt)
Ni
ppm
Cu
ppm
Co
ppm
S%
In Pit North
Indicated
7.6
719
211
227
0.20
In Pit Central
Indicated
4.6
775
191
228
0.23
In Pit South
Indicated
3.8
834
220
264
0.11
Total In Pits
INDICATED
16.1
762
207
236
0.19
Under North Pit
Inferred
8.0
710
202
180
0.20
Under Central Pit
Inferred
3.5
755
197
231
0.25
Under and within
South Pit
Inferred
8.4
834
236
268
0.15
Total Under Pits
INFERRED
19.9
770
216
226
0.19
Total Base Metals
Resource
GLOBAL
36.0
766
212
231
0.19
The Indicated Mineral Resources portion is 16.1 Mt at 762 ppm Nickel, 207 ppm Copper and 236 ppm Cobalt.
This part of the resource falls entirely within the existing pit designs for the proposed 25 year mine-life
vanadium project and is expected to be processed through the 1.6 Mt per annum crushing, milling and
beneficiation plant. AVL’s BFS reports a reserve of 30.9 million tonnes. The base metal resource portion of
the 30.9 Mt of high-grade vanadium resource that is included in the pits is 16.1 Mt and represents ~52% of
the total beneficiation plant feed.
The remaining Inferred Mineral Resource lies within the classified vanadium resource in the high-grade
domain beneath the base of each of the designed pits where pit optimisations are currently drill limited,
highlighting the potential for future production.
Copper Hills South prospect
The Copper Hills South prospect (formerly Gabanintha East) is located 1.5 kilometres south of the Copper
Hills prospect, on a granted mining lease M51/878. It was the outcome of a target generation review over
the area. 17
Bryah holds a suite of mineral rights over tenements held by AVL covering 148km². Bryah’s mineral rights are
for all minerals, excluding vanadium, titanium, cobalt, chromium, uranium, lithium, tantalum, iron ore and
manganese. The vanadium-titanium-magnetite deposit is approximately 11.5km long within the Project with
most of this lying on Mining Lease M51/878 which was granted in 2020.
16 ASX: BYH announcement 25th May 2022.
17 ASX: BYH announcement dated 28th February 2023 ‘Data Puts Copper Potential at Copper Hills South into Focus’.
17 | P a g e
2024 Annual Report
Lake Johnston Lithium – Lithium-Nickel Project (100% BYH)
Bryah’s Lake Johnston Lithium-Nickel project consists of nine exploration licences, held by Bryah, and its
100% owned subsidiary West Coast Minerals Pty. Ltd.
Figure 10 Bryah’s Lake Johnston Tenure.
Bryah’s exploration ground extends to within 10 kilometres east of the world class Mt Holland Lithium mine
and concentrator being developed under the Wesfarmers Limited/SQM Australia Pty Ltd joint venture. The
Mt Holland Lithium project includes the Earl Grey Lithium deposit with a reported Mineral Resource of 189
million tonnes grading 1.5% Li2O 18, making it a globally significant high-grade hard rock lithium deposit.
Bryah’s tenure is to the immediate west and north of Poseidon Nickel Limited’s Lake Johnston Project, which
encompasses the Maggie Hays/Emily Ann mine and associated processing plant, which is currently under
care and maintenance. The Emily Ann Mine historically produced 46,000 tonnes nickel with a resource grade
averaging 4.1% nickel 19.
18 ASX: KDR announcement dated 19 March 2018.
19 ASX: POS announcement dated 26 September 2018.
18 | P a g e
2024 Annual Report
Pegasus prospect
The Pegasus prospect is an area of mixed colluvium and aeolian sands with very poor outcrop. Bedrock
geology is interpreted to consist of amphibolite, Banded Iron Formation (BIF) and olivine komatiite within a
sliver of the Younami Terrane greenstone unit east of Lake Johnston. The area has previously been evaluated
for komatiite-hosted nickel, analogous to the nearby Maggie-Hays and Emily-Anne deposits.
At the Pegasus prospect, several outcropping pegmatites were observed at the southern end of the tenement
striking ~north-west before dipping under cover, hosted in a sheared amphibolite. These coarse to very
coarse pegmatites contain key indicator minerals (garnet and tourmaline) as well as mineral growth textures
(graphic quartz-feldspar texture) characteristic of LCT pegmatite deposits.
Despite no direct detection of anomalous lithium, the exceptionally anomalous Rb and subsequent low K/Rb
ratio, as well as anomalism in Nb, Cs and Be, is encouraging. These anomalous pegmatites are not widely
exposed in the area and no clear pegmatite zoning is therefore observed 20.
Soil sampling program was complete on Pegasus prospect in January 2024 which
Share your feedback
Discover